Laserfiche WebLink
<br />Haul Road A Widening. County Road 51 crossing. <br /> <br />SUPPORT FACILITIES - Rule 4.04: <br />The pipe crossing for the Collom water line has been completed. <br /> <br />The Collom substation has been constructed and completed. <br /> <br />The Collom rock crusher is nearing completion. A conveyor system to a silo has been constructed since the last <br />on-the-ground inspection. <br /> <br />The Collom water tank and ready line were being constructed at the time of the inspection. <br /> <br />Collom water pipe crossing. <br /> <br />TOPSOIL – Rule 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br />Topsoil stripping has occurred along the slopes of the Little Collom Gulch and Collom Facility Area. <br />