My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-20_REVISION - C1981012 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2018-08-20_REVISION - C1981012 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2021 10:58:46 AM
Creation date
8/21/2018 6:42:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Revision
Doc Date
8/20/2018
Doc Name
Application
From
New Elk Coal Company
To
DRMS
Type & Sequence
MR125
Email Name
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of cow <br />....,_;. COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />RECEIVED <br />AUG 2 0 2018 <br />APPLICATION FORM FOR A REVISION <br />TOA COAL MINING AND RECLAMATION PERMIT Division of Reclamation, <br />Mining & Safety <br />This form must be completed and submitted with all requests for minor revisions, as defined in Rule 1.04(73), <br />technical revisions, as defined in Rule 1.04(136), and permit revisions, as defined in Rule 1.04(90). All revisions <br />are to address the requirements of Rule 2.08.4. Three (3) copies of the revision, including maps, must be <br />submitted in order for it to be complete. <br />All revisions are to be formatted so they can be inserted into the permit to replace the revised sections, maps, <br />tables and/or figures, with a revised table of contents, if necessary. The revision submittal date should be printed <br />in the lower right corner of each revision page. A cover letter to the revision should explain the nature of the <br />revision and reference the specific permit sections being revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on the federal mailing list <br />(except OSM) at the same time the application is submitted to the Division, and proof of distribution must be <br />submitted to the Division along with the application. Copies of revision pages modified during the review process <br />must be distributed in the same manner, along with proof of distribution. Proof of distribution must be submitted <br />prior to implementation of the revision. <br />Permit No.: C - 1981 - 012 Date: 08 / 14 /2018 <br />Permittee: New Elk Coal Company LLC <br />New Elk Mine <br />12250 State Highway 12 <br />Weston <br />CO Zip Code: 81091 _ <br />Street: <br />City: <br />State: <br />Brief Description of Revision: Addition of Weed Management Plan to New Elk <br />permit. <br />Mineral Ownership - <br />Mineral Private (+/-) _ _ 0 _Acres Mineral State (+/-) _ _ _ Acres <br />Mineral Federal (+/-) _ _ 0 . _ Acres <br />Public Notice Attached: <br />Yes❑ <br />No✓❑(Required <br />for PRs and TRs) <br />Bond Increase: <br />Yes❑ <br />No✓❑ <br />Federal ® Non -Federal ❑✓ <br />Mine <br />Proposed Change in: <br />Permit Area - <br />Surface Ownership - <br />Disturbed <br />(+/-) _ <br />_ 0 _ <br />Acres Private Land (+/-) _ _ <br />0 _ Acres <br />Permit <br />(+/-) _ <br />_ 0 . —Acres <br />Federal Land (+/-) _ _ <br />0 _ Acres <br />Affected <br />(+/-) _ <br />_ 0 . —Acres <br />State Land (+/-) _ _ <br />0 —Acres <br />Mineral Ownership - <br />Mineral Private (+/-) _ _ 0 _Acres Mineral State (+/-) _ _ _ Acres <br />Mineral Federal (+/-) _ _ 0 . _ Acres <br />
The URL can be used to link to this page
Your browser does not support the video tag.