My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-20_PERMIT FILE - M1996049
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1996049
>
2018-08-20_PERMIT FILE - M1996049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2021 9:43:46 AM
Creation date
8/20/2018 4:11:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1996049
IBM Index Class Name
PERMIT FILE
Doc Date
8/20/2018
Doc Name Note
Impact of Permit
Doc Name
Complaint - GW impact
From
Summit Capital
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Raul Passerini, P.E. Page 9 <br /> June 24, 2015 <br /> renewals of this SWSP, the replacement water must be appurtenant to this site until a <br /> plan for augmentation is obtained. All replacement water must be concurrent with <br /> depletions in quantity, timing, and locations. <br /> 15. The Applicant must submit accounting reports electronically to the Division 5 Office <br /> (James Kellogg, Augmentation Plan Coordinator, iames.kelloQgCstate.co.us , <br /> telephone 970-945-5665 x5013) and Water Commissioner (Troy Wineland, <br /> troy.wineland@state.co.us , telephone 970-355-4516) on a monthly basis or other <br /> interval acceptable to both of them. The Applicant shall also provide an annual report <br /> to the Division Engineer and Water Commissioner by November 15`h, which <br /> summarizes diversions and replacements made pursuant to this SWSP. Accounting <br /> forms are subject to modification and approval by the Division Engineer. Flow rates <br /> shall be reported in cfs, volumes shall be reported in acre-feet. <br /> 16. The name, address, and phone number of a contact person who will be responsible for <br /> the operation and accounting of this SWSP must be provided with the accounting forms <br /> to the Division 5 Office and the Water Commissioner. <br /> 17. In accordance with approach no. 4 of the DRMS letter dated April 30, 2010, Everist <br /> provided an affidavit dated January 29, 2015, that dedicates the Applicant's <br /> interest in Famine Creek Ditch, the Old Whetstone Sheep Creek Ditch, the South <br /> Rock Creek Ditch, and the McKay Ditch, as replacement water solely for the <br /> Maryland Creek Ranch site (M-1996-049) for as long as there are depletions at this <br /> gravel pit site or until such time as other replacement sources are obtained. In <br /> addition, the affidavit indicates that Everist has entered into a contract with the <br /> U.S. Bureau of Reclamation for the right to obtain the annual release of 84 acre- <br /> feet of water from Green Mountain Reservoir. Of this total 20.8 acre-feet are <br /> needed for replacement of the long term stream depletions. For the purposes of <br /> this SWSP, this affidavit will be accepted for the dedication of the above water <br /> right and water from Green Mountain Reservoir; however, if the State Engineer <br /> determines that a different affidavit or dedication process is necessary to assure <br /> proper dedication of the shares, additional information may be required prior to <br /> future SWSP approvals. <br /> 18. The amount and location of the dry-up of the irrigated acreage associated with the <br /> subject Famine Creek Ditch, the Old Whetstone Sheep Creek Ditch, the South Rock <br /> Creek Ditch, and the McKay Ditch was previously documented and approved by the <br /> division engineer and water commissioner. <br /> 19. All diversions and deliveries of replacement water shall be measured in a manner <br /> acceptable to the Division Engineer. The Applicant shall install adequate measuring <br /> devices as required by the Division Engineer for the operation of this SWSP. <br /> 20. The approval of this SWSP does not relieve the Applicant and/or the landowner of the <br /> requirement to obtain a Water Court decree approving a permanent plan for <br /> augmentation or mitigation to ensure the permanent replacement of all depletions, <br /> including long-term evaporation losses and lagged depletions after gravel mining <br /> operations have ceased. If reclamation of the mine site will produce a permanent <br /> water surface exposing groundwater to evaporation, an application for a plan for <br /> augmentation must be filed with the Division 5 Water Court at least three (3) years <br /> prior to the completion of mining, to include, but not be limited to, long-term <br /> evaporation losses and lagged depletions. If a lined pond results after reclamation, <br />
The URL can be used to link to this page
Your browser does not support the video tag.