Abandonment
<br />DRMS Bond
<br />Drill Holes
<br />DMRS
<br />Diameter/
<br />Depth
<br />Report
<br />Hole ID
<br />AKA
<br />Release Status
<br />Released
<br />Insp Date
<br />Surface
<br />Depth
<br />Sealed Pad Area
<br />Road Area
<br />Map 09 identifier Permitting Action
<br />For Drill Pad
<br />Casing
<br />Acres
<br />Acres
<br />Yes
<br />2
<br />N/A
<br />Phase I, II, III
<br />Aug. 4-6, 2015
<br />4
<br />30
<br />30
<br />0
<br />0 Geotechnical Report
<br />Yes
<br />3
<br />N/A
<br />Phase I, II, III
<br />Aug. 4-6, 2015
<br />4
<br />25
<br />25
<br />0
<br />0 dated November 10, 21
<br />Yes
<br />4
<br />N/A
<br />Phase I, II, III
<br />Aug. 4-6, 2015
<br />4
<br />30
<br />30
<br />0
<br />0 in Volume IX.
<br />Yes
<br />5
<br />N/A
<br />Phase I, ll, III
<br />Aug. 4-6, 2015
<br />4
<br />25
<br />2SI
<br />0
<br />0 Disturbance covered
<br />Yes
<br />6
<br />N/A
<br />Phase I, II, III
<br />Aug. 4-6, 2015
<br />4
<br />25
<br />25
<br />0
<br />0 by Gob Pile #2
<br />Yes
<br />7
<br />N/A
<br />Phase I, II, III
<br />Aug. 4-6,201S
<br />4
<br />31
<br />31
<br />0
<br />0
<br />Yes
<br />8
<br />N/A
<br />Phase I, II, III
<br />Aug. 4-6, 2015
<br />4
<br />25
<br />25
<br />0
<br />0
<br />Yes
<br />9
<br />N/A
<br />Phase I, II, III
<br />Aug. 4-6, 2015
<br />4
<br />25
<br />25
<br />0
<br />0
<br />Yes
<br />10
<br />N/A
<br />Phase I, II, III
<br />Aug. 4-6, 2015
<br />4
<br />25
<br />25
<br />01
<br />0
<br />Yes
<br />11
<br />N/A
<br />Phase I, II, III
<br />Aug. 4-6, 2015
<br />41
<br />30
<br />30
<br />0
<br />0
<br />Yes
<br />12
<br />N/A
<br />Phase I, II, III
<br />Aug. 4-6, 2015
<br />4
<br />30
<br />30
<br />0
<br />0
<br />Yes
<br />13
<br />N/A
<br />Phase I, II, III
<br />Aug. 4-6, 2015
<br />4
<br />30
<br />30
<br />0
<br />0
<br />Yes
<br />14
<br />N/A
<br />Phase I, II, III
<br />Aug. 4-6, 2015
<br />4
<br />60
<br />60
<br />0
<br />0
<br />3 alluvial wells
<br />0
<br />139 MR30
<br />MR31 is well completi(
<br />AW -15
<br />N/A
<br />No
<br />3
<br />86
<br />1
<br />0
<br />0 139 Depths from AHR
<br />AW -16
<br />N/A
<br />No
<br />31
<br />75
<br />0
<br />0 139
<br />AW -17
<br />N/A
<br />No
<br />3
<br />62
<br />0
<br />0 139
<br />4 geotechnical holes
<br />MR 40
<br />No bond required
<br />5 wells from NOI
<br />0
<br />MR42
<br />N/A
<br />DH -65
<br />IP -65
<br />N/A
<br />N/A
<br />Transfer NO1 holes
<br />N/A
<br />DH -66
<br />IP -66
<br />N/A
<br />N/A
<br />into permit.
<br />N/A
<br />DH -66A
<br />IP -66A
<br />N/A
<br />Phase I, II, III
<br />Duplicated Below
<br />N/A
<br />DR -67
<br />N/A
<br />N/A
<br />N/A
<br />DH -67A
<br />N/A
<br />N/A
<br />5 piezometers from NOI
<br />245
<br />0
<br />01 MR45
<br />BD -101
<br />N/A
<br />No
<br />2
<br />16.5
<br />0
<br />0 Bruce Park Dam
<br />BD -103
<br />N/A
<br />No
<br />2
<br />53
<br />0
<br />0 Piezometers
<br />BD -105
<br />N/A
<br />No
<br />2
<br />107
<br />0
<br />0 Ref Volume X
<br />BD -105A
<br />N/A
<br />No
<br />21
<br />38.5
<br />0
<br />0
<br />BD -102
<br />N/A
<br />No
<br />2
<br />30
<br />0
<br />0
<br />3 piezometers from NO1
<br />92
<br />MR46
<br />BL -101A
<br />N/A
<br />No
<br />2
<br />29
<br />0
<br />0 Bruce Park Dam
<br />BL -102
<br />N/A
<br />No
<br />2
<br />34
<br />0
<br />0 Piezometers
<br />BL -102A
<br />N/A
<br />No
<br />2
<br />29
<br />0
<br />0 Ref Volume X
<br />D -Seam to Surface Borehole
<br />MR48
<br />pilot hole for vent shaft
<br />N/A
<br />Phase I, 11, 111
<br />Aug. 4-6, 2015
<br />151
<br />215
<br />0
<br />0
<br />2 geotechnical holes
<br />0
<br />MR53
<br />Yes
<br />B -BURN -24
<br />Phase I
<br />Yes
<br />Aug. 4-6, 2015
<br />6
<br />303
<br />303
<br />0
<br />01 142 Only approved one hol
<br />N/A
<br />TC -OS -04
<br />TR-CRK-78
<br />N/A
<br />Phase I, II, III
<br />Aug. 4-6, 2015
<br />0
<br />0
<br />1 geotechnical hole
<br />0
<br />0 MR54
<br />Yes
<br />TC -05-04
<br />TR-CRK-78
<br />N/A
<br />Phase I, II, III
<br />Aug. 4-6, 2015
<br />2
<br />1010
<br />1010
<br />143
<br />5 GVBs
<br />4249
<br />0
<br />0 MR55
<br />Yes
<br />GVB-B2-A
<br />GVB-62-13
<br />Phase I, II
<br />Yes
<br />Aug. 4-6, 2015
<br />9.625/6.6/16
<br />1197
<br />790
<br />0
<br />0 144 1 Drilled from Existing dr
<br />N/A
<br />GVB-B2-B
<br />N/A
<br />N/A
<br />1
<br />01
<br />0 1441 Hole Relocated
<br />Yes
<br />GVB-82-C
<br />GVB-B2-E
<br />Phase I, II
<br />Phase I, 11, 111
<br />Aug. 4-6, 2015
<br />9.625/6.6/16
<br />762
<br />151
<br />01
<br />01 144 Drilled from Existing dr
<br />Yes
<br />GVB-83-A
<br />GVB-B3-C
<br />I Phase I, II
<br />Phase I, 11, 111
<br />Aug. 4-6, 2015
<br />10.75/16
<br />1220
<br />7391
<br />01
<br />01 144 1 Drilled from Existing dr
<br />MR -192 2.05-45ii 02/17
<br />)03
<br />n diagrams
<br />ill sites.
<br />ill sites.
<br />ill sites.
<br />
|