Laserfiche WebLink
Abandonment <br />DRMS Bond <br />Drill Holes <br />DMRS <br />Diameter/ <br />Depth <br />Report <br />Hole ID <br />AKA <br />Release Status <br />Released <br />Insp Date <br />Surface <br />Depth <br />Sealed Pad Area <br />Road Area <br />Map 09 identifier Permitting Action <br />For Drill Pad <br />Casing <br />Acres <br />Acres <br />Yes <br />2 <br />N/A <br />Phase I, II, III <br />Aug. 4-6, 2015 <br />4 <br />30 <br />30 <br />0 <br />0 Geotechnical Report <br />Yes <br />3 <br />N/A <br />Phase I, II, III <br />Aug. 4-6, 2015 <br />4 <br />25 <br />25 <br />0 <br />0 dated November 10, 21 <br />Yes <br />4 <br />N/A <br />Phase I, II, III <br />Aug. 4-6, 2015 <br />4 <br />30 <br />30 <br />0 <br />0 in Volume IX. <br />Yes <br />5 <br />N/A <br />Phase I, ll, III <br />Aug. 4-6, 2015 <br />4 <br />25 <br />2SI <br />0 <br />0 Disturbance covered <br />Yes <br />6 <br />N/A <br />Phase I, II, III <br />Aug. 4-6, 2015 <br />4 <br />25 <br />25 <br />0 <br />0 by Gob Pile #2 <br />Yes <br />7 <br />N/A <br />Phase I, II, III <br />Aug. 4-6,201S <br />4 <br />31 <br />31 <br />0 <br />0 <br />Yes <br />8 <br />N/A <br />Phase I, II, III <br />Aug. 4-6, 2015 <br />4 <br />25 <br />25 <br />0 <br />0 <br />Yes <br />9 <br />N/A <br />Phase I, II, III <br />Aug. 4-6, 2015 <br />4 <br />25 <br />25 <br />0 <br />0 <br />Yes <br />10 <br />N/A <br />Phase I, II, III <br />Aug. 4-6, 2015 <br />4 <br />25 <br />25 <br />01 <br />0 <br />Yes <br />11 <br />N/A <br />Phase I, II, III <br />Aug. 4-6, 2015 <br />41 <br />30 <br />30 <br />0 <br />0 <br />Yes <br />12 <br />N/A <br />Phase I, II, III <br />Aug. 4-6, 2015 <br />4 <br />30 <br />30 <br />0 <br />0 <br />Yes <br />13 <br />N/A <br />Phase I, II, III <br />Aug. 4-6, 2015 <br />4 <br />30 <br />30 <br />0 <br />0 <br />Yes <br />14 <br />N/A <br />Phase I, II, III <br />Aug. 4-6, 2015 <br />4 <br />60 <br />60 <br />0 <br />0 <br />3 alluvial wells <br />0 <br />139 MR30 <br />MR31 is well completi( <br />AW -15 <br />N/A <br />No <br />3 <br />86 <br />1 <br />0 <br />0 139 Depths from AHR <br />AW -16 <br />N/A <br />No <br />31 <br />75 <br />0 <br />0 139 <br />AW -17 <br />N/A <br />No <br />3 <br />62 <br />0 <br />0 139 <br />4 geotechnical holes <br />MR 40 <br />No bond required <br />5 wells from NOI <br />0 <br />MR42 <br />N/A <br />DH -65 <br />IP -65 <br />N/A <br />N/A <br />Transfer NO1 holes <br />N/A <br />DH -66 <br />IP -66 <br />N/A <br />N/A <br />into permit. <br />N/A <br />DH -66A <br />IP -66A <br />N/A <br />Phase I, II, III <br />Duplicated Below <br />N/A <br />DR -67 <br />N/A <br />N/A <br />N/A <br />DH -67A <br />N/A <br />N/A <br />5 piezometers from NOI <br />245 <br />0 <br />01 MR45 <br />BD -101 <br />N/A <br />No <br />2 <br />16.5 <br />0 <br />0 Bruce Park Dam <br />BD -103 <br />N/A <br />No <br />2 <br />53 <br />0 <br />0 Piezometers <br />BD -105 <br />N/A <br />No <br />2 <br />107 <br />0 <br />0 Ref Volume X <br />BD -105A <br />N/A <br />No <br />21 <br />38.5 <br />0 <br />0 <br />BD -102 <br />N/A <br />No <br />2 <br />30 <br />0 <br />0 <br />3 piezometers from NO1 <br />92 <br />MR46 <br />BL -101A <br />N/A <br />No <br />2 <br />29 <br />0 <br />0 Bruce Park Dam <br />BL -102 <br />N/A <br />No <br />2 <br />34 <br />0 <br />0 Piezometers <br />BL -102A <br />N/A <br />No <br />2 <br />29 <br />0 <br />0 Ref Volume X <br />D -Seam to Surface Borehole <br />MR48 <br />pilot hole for vent shaft <br />N/A <br />Phase I, 11, 111 <br />Aug. 4-6, 2015 <br />151 <br />215 <br />0 <br />0 <br />2 geotechnical holes <br />0 <br />MR53 <br />Yes <br />B -BURN -24 <br />Phase I <br />Yes <br />Aug. 4-6, 2015 <br />6 <br />303 <br />303 <br />0 <br />01 142 Only approved one hol <br />N/A <br />TC -OS -04 <br />TR-CRK-78 <br />N/A <br />Phase I, II, III <br />Aug. 4-6, 2015 <br />0 <br />0 <br />1 geotechnical hole <br />0 <br />0 MR54 <br />Yes <br />TC -05-04 <br />TR-CRK-78 <br />N/A <br />Phase I, II, III <br />Aug. 4-6, 2015 <br />2 <br />1010 <br />1010 <br />143 <br />5 GVBs <br />4249 <br />0 <br />0 MR55 <br />Yes <br />GVB-B2-A <br />GVB-62-13 <br />Phase I, II <br />Yes <br />Aug. 4-6, 2015 <br />9.625/6.6/16 <br />1197 <br />790 <br />0 <br />0 144 1 Drilled from Existing dr <br />N/A <br />GVB-B2-B <br />N/A <br />N/A <br />1 <br />01 <br />0 1441 Hole Relocated <br />Yes <br />GVB-82-C <br />GVB-B2-E <br />Phase I, II <br />Phase I, 11, 111 <br />Aug. 4-6, 2015 <br />9.625/6.6/16 <br />762 <br />151 <br />01 <br />01 144 Drilled from Existing dr <br />Yes <br />GVB-83-A <br />GVB-B3-C <br />I Phase I, II <br />Phase I, 11, 111 <br />Aug. 4-6, 2015 <br />10.75/16 <br />1220 <br />7391 <br />01 <br />01 144 1 Drilled from Existing dr <br />MR -192 2.05-45ii 02/17 <br />)03 <br />n diagrams <br />ill sites. <br />ill sites. <br />ill sites. <br />