Laserfiche WebLink
Privileged and Confidential-Attorney Client Communication Geosyntec' <br /> consultants <br /> 5. STAFFING APPROACH <br /> OSMI has directed Geosyntec to lead the implementation of this Work Plan with <br /> support from CSM and OSMI Mine staff. The primary activities to be conducted as part <br /> of this Work Plan implementation and the corresponding responsible party are <br /> identified in Table 15. <br /> Table 15: Staffing Approach <br /> Activity espons>I e` arty` <br /> Collecting water for the first bench-scale Geosyntec <br /> tests and delivering to CSM <br /> Collecting water for the second bench-scale OSMI <br /> test and shipping to CSM <br /> Conducting bench-scale jar tests at CSM Geosyntec with support from CSM student to <br /> be identified <br /> Purchasing pilot-scale materials and OSMI <br /> transporting to Mine <br /> Pilot-scale construction OSMI <br /> Pilot-scale start-up,troubleshooting, and Geosyntec with support from OSMI <br /> training <br /> OSMI with potential third party support to be <br /> Pilot-system operation and sampling further evaluated depending on OSMI staff <br /> availability <br /> Data analysis,QA/QC, reporting Geosyntec with support from CSM (Dr. <br /> Figueroa and a student to be identified) <br /> Treatability Study Work Plan 25 February 8,2018 <br />