My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-16_REVISION - M2012032
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2018-08-16_REVISION - M2012032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2021 7:37:44 PM
Creation date
8/16/2018 4:24:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
8/16/2018
Doc Name
Request for Technical Revision
From
Brian K. Briggs
To
DRMS
Type & Sequence
TR10
Email Name
THM
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Privileged and Confidential-Attorney Client Communication Geosyntec' <br /> consultants <br /> 5. STAFFING APPROACH <br /> OSMI has directed Geosyntec to lead the implementation of this Work Plan with <br /> support from CSM and OSMI Mine staff. The primary activities to be conducted as part <br /> of this Work Plan implementation and the corresponding responsible party are <br /> identified in Table 15. <br /> Table 15: Staffing Approach <br /> Activity espons>I e` arty` <br /> Collecting water for the first bench-scale Geosyntec <br /> tests and delivering to CSM <br /> Collecting water for the second bench-scale OSMI <br /> test and shipping to CSM <br /> Conducting bench-scale jar tests at CSM Geosyntec with support from CSM student to <br /> be identified <br /> Purchasing pilot-scale materials and OSMI <br /> transporting to Mine <br /> Pilot-scale construction OSMI <br /> Pilot-scale start-up,troubleshooting, and Geosyntec with support from OSMI <br /> training <br /> OSMI with potential third party support to be <br /> Pilot-system operation and sampling further evaluated depending on OSMI staff <br /> availability <br /> Data analysis,QA/QC, reporting Geosyntec with support from CSM (Dr. <br /> Figueroa and a student to be identified) <br /> Treatability Study Work Plan 25 February 8,2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.