My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-16_REVISION - M2012032
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2018-08-16_REVISION - M2012032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2021 7:37:44 PM
Creation date
8/16/2018 4:24:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
8/16/2018
Doc Name
Request for Technical Revision
From
Brian K. Briggs
To
DRMS
Type & Sequence
TR10
Email Name
THM
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Privileged and Confidential-Attorney Client Communication Geosyntec <br /> Consultants <br /> Table 14: Pilot- esting Samplinp, and Anal tical Plan <br /> umber <br /> MWP Bioreactor Bioreactor of <br /> Constituent Inlet* Wetland Wetland <br /> Outlet Outlet I Outlet I Outlet 2 Outlet 2 Samples <br /> *** <br /> Dissohcd Weekly 84 <br /> Oxygen <br /> ORP Weekly 84 <br /> PH Weekly 84 <br /> Temperature Weekly 84 <br /> Conductivity Weekly 84 <br /> Total Metals Monthly Monthly Bi-weekly Weekly Monthly Bi-weekly 36 <br /> Analysis <br /> Dissolved <br /> Metals Monthly Monthly Bi-weekly Weekly Monthly Bi-weekly 36 <br /> Analysis <br /> Residue,Non- <br /> Filterable Monthly Monthly Bi-weekly Weekly Monthly Bi-weekly 36 <br /> TSS 105C <br /> Total Anions <br /> and Cations Monthly Monthly Bi-weekly Weekly Monthly Bi-weekly 36 <br /> s eciated <br /> Sulfate Monthly 20 <br /> Nitrate/Nitrite Monthly 20 <br /> as N <br /> Phosphorous Monthly 20 <br /> ortho dissolved <br /> 5-day <br /> Biochemical <br /> Oxygen Monthly 20 <br /> Demand <br /> BOD <br /> Alkalinity Monthly 20 <br /> TDS Monthly 20 <br /> DOC Monthly 20 <br /> Mercury Monthly 20 <br /> CN Monthly 20 <br /> *Highlighted monthly sampling for inlet is included under separate budget for inlet <br /> **Assumes 14 weeks of running the pilot system and 4 sets of monthly samples <br /> ***Sampling will also be conducted periodically at the point after either Aerobic Wetland A or B,and at <br /> the outlet of Anaerobic Wetlands 1 and 2;this sampling should ideally be conducted monthly and would <br /> include 8 more sets of samples for each constituent than is listed in the chart <br /> Geosyntec will be responsible for managing the data collected during the bench-scale <br /> and pilot-scale tests and assessing the quality of data using the QA/QC tests <br /> Treatability Study Work Plan 23 February 8,2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.