Privileged and Confidential-Attorney Client Communication GeosMtec <br /> consultants <br /> Table 12: Pilot-Scale Timeline and Objectives <br /> T' 6, .. P-rameterto.be Tested <br /> • Amount of time expected for biological system stabilization <br /> during start-up <br /> March and early April • Potential need to feed additional supplements to enhance <br /> speed of system stabilization <br /> • Evaluate hybrid MWP by adjusting chemical dose,residence <br /> times,mixing energies <br /> • Train 1: confirm proof of concept and ability of system to <br /> achieve water quality goals before and during Spring runoff <br /> • Train 2: evaluate impacts from changing operational <br /> April —June (-2.5 - 3 variables <br /> months) o Flowrate and associated residence times <br /> o Addition of supplements <br /> o Simulate potential challenge conditions such as a <br /> process upset or short-term shutdown <br /> • Both trains: assess performance of construction materials <br /> and potential impacts to porosity during study <br /> Treatability Study Work Plan 21 February 8,2018 <br />