My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-16_REVISION - M2012032
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2018-08-16_REVISION - M2012032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2021 7:37:44 PM
Creation date
8/16/2018 4:24:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
8/16/2018
Doc Name
Request for Technical Revision
From
Brian K. Briggs
To
DRMS
Type & Sequence
TR10
Email Name
THM
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Privileged and Confidential-Attorney Client Communication V eosyntec <br /> Consultants <br /> Table 10: Jar Testing Setup <br /> # Testriterii� <br /> Dose Dose Dose Dose Dose Dose . Turbidity after <br /> 1 Coagulant 1 2 3 1 2 3 settling <br /> Dose <br /> • Metals removal <br /> pH pH pH adj pH adj G = 1 G =2 G=3 e Turbidity after <br /> Adjustment/ adj dose 2 dose 3 settling <br /> Mixing dose 1 • Metals removal <br /> Energy <br /> *Blue shading denotes Coagulant 1,Red shading denotes Coagulant 2 <br /> **pH for all tests is not adjusted unless otherwise noted,SOR= 100 gpm for the first set of jar tests and <br /> 1,215 gpm for the second set of jar tests,G= 1 unless otherwise noted <br /> ***Coagulant and dose to be determined after Coagulant Dose Jar Test#1 <br /> 3.3 Pilot-Scale Testing <br /> The pilot-scale test for the hybrid passive treatment system will be built in the Mine <br /> portal and fed water pumped from the Mill Water Feed. It will model the conceptual <br /> process flow diagram: hybrid MWP, aerobic wetland, Pond 42 SRB, and Pond #3 <br /> Anaerobic Wetland with an aerobic discharge. Due to the short schedule available for <br /> testing, Geosyntec recommends two trains for the SRB and downstream wetland so that <br /> we can maintain proof of concept analysis for one train and have the flexibility to <br /> conduct stress tests on the second train. In addition, one of the two SRBs will have a <br /> layer of GAC to evaluate the potential benefits of increasing the available surface area <br /> for biological activity in a cold weather system. A schematic of the pilot-scale testing <br /> set-up is shown in Figure 4. <br /> Treatability Study Work Plan 17 February 8,2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.