My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-16_REVISION - M2012032
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2018-08-16_REVISION - M2012032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2021 7:37:44 PM
Creation date
8/16/2018 4:24:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
8/16/2018
Doc Name
Request for Technical Revision
From
Brian K. Briggs
To
DRMS
Type & Sequence
TR10
Email Name
THM
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Privileged and Confidential—Attorney Client Communication Geos ``tec <br /> consultants <br /> Additional parameters that may be impacting toxicity for the whole effluent toxicity <br /> (WET) tests could include nitrate, nitrite, ammonia, and/or selenium. For additional <br /> Mine water quality information, please see Technical Memorandum Water Quality and <br /> Flow Data Analysis for the Design of a Passive Water Treatment System at the Revenue <br /> Mine (January 18, 2018). <br /> 1.4 Work Plan Objectives and Content <br /> The goal of this Work Plan is to: <br /> • Provide a conceptual design for the passive hybrid water treatment system and <br /> recommend materials that should be retained for testing and used for <br /> construction <br /> • Test assumptions to develop a basis of design for construction <br /> • Develop schedule for full-scale implementation <br /> Table 3 shows the structure of this document, along with objectives for each section. <br /> Table 3: Work Plan Structure and Objectives <br /> Conceptual Design and • Summarize existing infrastructure, review <br /> 2.0 Schedule passive treatment technologies,and create <br /> process flow diagram for the preliminary <br /> conceptual design <br /> 3.0 Pilot and Bench Testing • Identify the bench-and pilot-scale testing <br /> Approach systems, strategy, and schedule <br /> 4.0 Sampling and Monitoring • Establish a plan for sampling and monitoring <br /> the pilot and bench scale systems <br /> Management and Staffing • Identify staffing needs and approach <br /> 5.0 Approach <br /> Treatability Study Work Plan 5 February 8,2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.