My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-16_REVISION - M2012032
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2018-08-16_REVISION - M2012032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2021 7:37:44 PM
Creation date
8/16/2018 4:24:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
8/16/2018
Doc Name
Request for Technical Revision
From
Brian K. Briggs
To
DRMS
Type & Sequence
TR10
Email Name
THM
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Privileged and Confidential-Attorney Client Communication Geosyntee <br /> con"Idtant" <br /> Table 1: Mine Site Design Considerations <br /> • Seasonal changes in pumped water volumes from the portal — <br /> low flow is typically October through April <br /> Water Flow Rate* • Design low flow: 100 gallons per minute(gpm)(historical low <br /> on record was 1 11 gpm in December 2015) <br /> • Design high flow: 1,215 gpm** <br /> o Permit 30-Day Average: 1.75 MGD(1,215 gpm) <br /> • High monthly average temperature:July, 78°F <br /> Climate and • Low monthly average temperature: January, 15°F <br /> Temperature Highest recorded temperature: June,960F <br /> Fluctuations*** • Lowest recorded temperature:January,-22°F <br /> • Average number of days below 32°F: 182 <br /> Water Temperature • To be evaluated through pilot-scale testing as discussed in <br /> Section 3 of this Work Plan <br /> Precipitation** • 40"/year <br /> Evaporation** • 35"/year <br /> Elevation • Mine elevation is 10,600' <br /> • Low population density <br /> Remote Location and <br /> • Challenging access to the Mine, especially during snow <br /> Site Constraints conditions <br /> • Constrained site footprint with limits to expanding pond sizes <br /> as described in Section 2 of this Work Plan <br /> *Mine historical flow data and guidance provided by OSMI for now rate min/max assumptions <br /> **Source:CDPS Permit CO-0000003,Permit Modification 3 <br /> ***Temperatures taken from gauge in Ouray,CO,elevation 8,987';the Mine is located higher than <br /> temperature gauge at 10,600',so temperatures at the Mine are likely lower <br /> Water flow at the Mine varies seasonally with a minimum recorded value of 111 gpm <br /> and a maximum flow of 1,366 gpm as indicated in Figure 1. Spring runoff generally <br /> begins in May/June and continues through August/September, with low flow conditions <br /> October through April. This broad range of seasonal flows is an important factor in the <br /> design and operation of passive treatment systems (Ness, Janin, & Stewart, 2014). <br /> Treatability Study work Plan 2 February 8,2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.