Laserfiche WebLink
May 2018 C-1981-010/Trapper Mine RAR <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 8 <br />Number of Complete Inspections this Fiscal Year: 4 <br /> <br /> Page 7 of 8 <br /> <br /> Map1: Overview of Trapper Mine and Field Collected Elevations. <br /> <br /> <br /> <br /> <br /> <br />Map 2 (left): Transects and collected elevation points <br />in parcel ZA17. <br /> <br /> <br />A total of 38 points were collected along three <br />transects in parcel ZA17. Transect 1 <br />comprised a constructed drainage, trending <br />south to northeast down the slope. Transect 2 <br />runs from south to north west down the slope. <br />Transect 3 runs across the north facing slope <br />from west to east. A number of points were <br />discarded as they either fell outside the parcel <br />boundary or off the transects. These (12) <br />points will be not be utilized in the analysis. <br />Points comprising the analysis are provided in <br />Table 1 at the end of this report. <br /> <br /> <br />Trapper <br />Benchmark <br />Field <br />Elevations