My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-13_REPORT - M1974086
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1974086
>
2018-08-13_REPORT - M1974086
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2018 6:59:52 AM
Creation date
8/14/2018 6:15:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1974086
IBM Index Class Name
Report
Doc Date
8/13/2018
Doc Name
Slide Stabilization Report
From
APC
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PC <br />The Sign of Quality <br />August 13, 2018 <br />Department of Natural Resources <br />Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RE: Status Report; APC Construction Co â Ralston Quarry <br />14802 W 44`h Avenue <br />Golden, Colorado 80403 <br />Office: 303-279-6611 <br />Fax: 303-279-6216 <br />www.apc.us.com <br />Following the Ground Engineering evaluation on Monday, August 6`h, drilling operations for the test <br />holes began on Tuesday, August 7Ih. Test holes were installed five different locations in and <br />surrounding the slide area. The holes were drilled to a depth of 20-30 feet and plastic pipe was <br />installed so they can be monitored. Soils were extracted and will be analyzed by Ground Engineering. <br />Also on Tuesday, August 7`h, APC met with two representatives from Greg Lewicki and Associates. <br />After an office consultation we toured the site. They will be assisting in filing a permit amendment to <br />incorporate additional area into the mining boundary. They will also be involved with coordination <br />between themselves and Ground Engineering and working towards final resolution and reclamation <br />of the slide area. <br />As described in this report, a number of different people with various areas of expertise were on the <br />site during the week of August 6`h. We also did our internal monitoring. All parties agreed the slide <br />area appears to stable and we continue to observe some water leaching at the very bottom of the <br />slope. <br />On Friday August 10`h, APC received a response to the request for a continuance until the September <br />MLRB board meeting. We appreciate this consideration due to the amount of information that will be <br />necessary to be gathered in order to completely remediate the situation. <br />Thanks, <br />Stanley C. Opperman <br />Vice President â Operations <br />APC Construction Co., LLC <br />Net,.n <br />40 <br />&-ro.ad, Asphan QD <br />Payment A --tâ <br />
The URL can be used to link to this page
Your browser does not support the video tag.