Laserfiche WebLink
o � 1 <br />ATTACHMENT A ( Daily Emissions) <br />a <br />c <br />7 <br />E <br />r- y <br />j <br />o <br />o <br />CA o <br />Daily Throughput <br />> 'E � <br />Z <br />5 } <br />'L <br />a <br />Process description <br />0- <br />Emission factor <br />Control type <br />W u <br />(units/day) <br />W <br />LL- <br />LReceiving <br />Receivinghopper, and <br />PM <br />0.0237 <br />lbs/ton <br />Atomizing spray, <br />75.23% <br />33,600 <br />tons <br />197 <br />N <br />N <br />Grizzly. One (1) Stamler, <br />shipped <br />enclosed conveyor <br />shipped <br />L <br />r <br />c <br />Model: BF -14D -G-10, S/N: <br />2 <br />O <br />11780, Primary crusher,PM10 <br />0.0074 <br />lbs/ton <br />See PM Control <br />74.92% <br />33,600 <br />tons <br />63 <br />N <br />$ <br />Covered belt conveyor <br />shipped <br />shipped <br />0 <br />o <br />system, Coal storage bin with <br />c <br />telescoping discharge chute <br />lbs/ton <br />tons <br />for loading of haul trucks. <br />PM2.5 <br />0.0012 <br />shipped <br />See PM Control <br />73.61% <br />33,600 <br />shipped <br />10 <br />N <br />tf <br />a <br />c <br />�c <br />E� <br />ooro <br />vo <br />o <br />c <br />Daily Throughput <br />c 'E g} <br />on <br />'L <br />a <br />Process description <br />a <br />Emission factor <br />Control type <br />�'' <br />(units/day) <br />w <br />U- ... <br />Receipt of primary crushed <br />lbs/ton <br />Baghouse, <br />tons <br />coal: One (1) Carmon, Model: <br />PM <br />0.0533 <br />shipped <br />water/chemical <br />97.57% <br />36,000 <br />shipped <br />47 <br />N <br />N <br />5536, and S/N: not available, <br />suppression <br />s <br />c <br />feeder for feeding primary <br />CA <br />c <br />crushed coal to secondary <br />PM10 <br />0.0213 <br />lbs/ton <br />See PM Control <br />97.51% <br />36,000 <br />tons <br />19 <br />N <br />$ <br />crusher. <br />shipped <br />shipped <br />oOne <br />(1) Kopper, Model: not <br />cc <br />o <br />available, and S/N: 180, <br />hammer ring type secondary <br />PMZ 5 <br />0.0200 <br />lbs/ton <br />See PM Control <br />98.87% <br />36,000 <br />tons <br />8 <br />N <br />crusher. <br />shipped <br />shipped <br />Page 18 of 22 <br />