My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-10_REVISION - C1981019 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2018-08-10_REVISION - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2018 12:13:49 PM
Creation date
8/10/2018 10:26:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
8/10/2018
Doc Name
Adequacy Review Response
From
Tri-State Generation and Transmission Association, Inc
To
DRMS
Type & Sequence
TR121
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRI-STATE GENERATION AND TRANSMISSION ASSOCIATION, INC. <br />HEADQUARTERS: P.O. BOX 33695 DENVER, COLORADO 80233-0695 303-452-6111 <br />August 8, 2018 <br />Mr. Zach Trujillo <br />Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining & Safety <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RE: Colowyo Coal Company L.P. <br />Permit No. C-1981-019 <br />Technical Revision No. 121 <br />Adequacy Response <br />Dear Mr. Trujillo, <br />ft <br />gis <br />wSION of �q cp <br />M�NN�� W <br />Tri-State Generation and Transmission Association Inc. (Tri-State), is the parent <br />company to Axial Basin Coal Company, which is the general partner to Colowyo Coal Company <br />L.P. (Colowyo). Tri-State received your adequacy letter dated August 7, 2018 and is providing <br />the response below to your adequacy concern on behalf of Colowyo. The Colowyo Mine <br />operates under Permit No. C-1981-019. <br />1. On proposed Volume 15, Rule 4, Page 4, the page is missing all discussions regarding <br />Sections 4.05.1— 4.05.5 that is on currently approved Page 4. Please include these <br />Sections in the proposed page Volume 15, Rule 4, Page 4. <br />Response: A page break has been removed from Rule 4, Page 4, and that has corrected <br />the issues of Sections 4.05.1 through 4.05.5 not appearing on Rule 4, Page 4. <br />2. Please update proposed Map 13C-1 Sheet 1 to include the revised disturbance boundary <br />approved with MR -188. <br />Response: Map 13C-1 Sheet 1 has been updated with the topsoil removal boundary <br />approved under MR -188 as requested. <br />3. As discussed between the Division and Colowyo, a reclamation cost estimate (RCE) to <br />reclaim the disturbances associated with TR -121 will be performed once the temporary <br />suspension on conducting RCEs has been lifted. <br />Response: Colowyo needs to construct this power line in the fall of this year. Therefore, <br />it is becoming business critical that this technical revision and the temporary suspension <br />of RCE's be resolved in a very timely manner. <br />AN EQUAL OPPORTUNITY/AFRRNATIVEACTION EMPLOYER <br />A Touchstone Energy Cooperative O. -A <br />CRAIG STATION ESCALANTE STATION NUCLA STATION <br />P.O. BOX 1307 P.O. BOX 577 P.O. BOX 698 <br />CRAIG, CO 81626-1307 PREWRT. NM 87015 NUCLA, CO 61424.0698 <br />970-821.4411 505-876-2271 97"64-7316 <br />
The URL can be used to link to this page
Your browser does not support the video tag.