Laserfiche WebLink
Bulldozer Worksheet Cont’d Task # 016 Page 1 of 2 <br /> <br /> <br />BULLDOZER WORK <br /> <br />Task description: Regrade and Rip 6 North Main Pad <br />Site: Foidel Creek Mine Permit Action: RN7 Permit/Job#: C1982056 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 016 State: Colorado Abbreviation: None <br />Date: 2/22/2018 County: Routt Filename: 016 <br />User: TNL <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D10T - 10SU <br />Horsepower: 574 <br />Blade Type: Semi-Universal <br />Attachment: 3-shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $122.17 NA <br />Operating Cost/Hour: $111.29 100 <br />Ripper own. Cost/Hour: $14.40 NA <br />Ripper op. Cost/Hour: $1.24 15 <br />Operator Cost/Hour: $41.85 NA <br />Total unit Cost/Hour: $290.94 <br />Total Fleet Cost/Hour: $290.94 <br /> <br />MATERIAL QUANTITIES <br />Initial Volume: 8,954 <br />Swell factor: 1.090 <br />Loose volume: 9,760 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br /> <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />Unadjusted hourly production: 2,748.7 LCY/hr <br /> <br />Materials consistency description: Consolidated stockpile 1.0 <br /> <br />Average push gradient: 5 % <br />Average site altitude: 7,000 feet <br /> <br />Material weight: 2,400 lbs/LCY <br /> <br />Weight description: Clay and gravel - Dry <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.000 (CAT HB) <br />Dozing method: 1.000 (GEN.) <br />Visibility: 1.000 (AVG.)