My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-09_REVISION - C1982056
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2018-08-09_REVISION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2018 6:53:51 AM
Creation date
8/10/2018 5:53:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
8/9/2018
Doc Name Note
Cost Estimate
Doc Name
Cost Estimate
From
DRMS
To
Jerry Nettleton
Type & Sequence
RN7
Email Name
TNL
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont’d Task # 001 Page 2 of 2 <br /> <br /> <br />Job efficiency: 0.830 (1 SHIFT/DAY) <br />Spoil pile: 0.800 (FND-RF) <br />Push gradient: 1.329 (CAT HB) <br />Altitude: 1.000 (CAT HB) <br />Material Weight: 0.868 (CAT HB) <br />Blade type: 1.000 (PAT) <br /> <br />Net correction: 0.5515 <br /> <br />Adjusted unit production: 274.26 LCY/hr <br />Adjusted fleet production: 822.78 LCY/hr <br /> <br />JOB TIME AND COST <br /> <br />Fleet size: 3 Dozer(s) <br />Unit cost: $1.004/LCY <br /> <br />Total job time: 476.40 Hours <br />Total job cost: $393,466 <br />
The URL can be used to link to this page
Your browser does not support the video tag.