My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-09_REPORT - M1974086
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1974086
>
2018-08-09_REPORT - M1974086
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2021 2:41:25 PM
Creation date
8/9/2018 3:57:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1974086
IBM Index Class Name
Report
Doc Date
8/9/2018
Doc Name Note
Hearing Date Postponement Request
From
APC
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PC <br />RECOVE® <br />NO 09 018 <br />""The Sign of Quality "MOON of REQARV �, •'-r� <br />M <br />August 7, 2018 ININGANp UM e <br />Eric Scott <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street <br />Denver, CO 80202 <br />Re: Ralston Quarry M-1974-086 <br />Dear Eric: <br />14802 W 44'h Avenue <br />Golden, Colorado 80403 <br />Office: 303-279-6611 <br />Fax: 303-279-6216 <br />www.ape.us.com <br />1 L%" C1 DNININ <br />NOLLWN1338 AO NOISIAla <br />91oa so onv <br />®31►l333l! <br />We are writing to request a postponement of our hearing date. We have hired Greg Lewicki and <br />Associates to help us with the slide at the Ralston Quarry and some other related items. Greg spoke <br />with Russ Means about moving our hearing to the September 26`" meeting for the following reasons: <br />I . We have hired Ground Engineering a Geotech company to evaluate the slide and surrounding <br />area. They have made three site visits to date and will continue to monitor the site. They are <br />scheduled to drill test holes and will use this information on soils and water to prepare a <br />geotechnical report. We would like the Report to be submitted to the Division prior to the <br />hearing date and this will not be possible if the date is August 22"d <br />2. We plan on submitting an Amendment to the permit to absorb the encroached area, and possibly <br />add some additional area to the mining permit. We would like to have this Amendment draft <br />ready or nearly ready by the time of the September hearing date. <br />3. As previously stated, we would like to have our Geotechnical Report submitted for review prior <br />to the hearing. This could be submitted as a technical revision or be included in the <br />comprehensive information provided with the amendment. We cannot have this ready prior to <br />the August date. <br />4. Both Jeff Keller, our President and Greg Lewicki will be out of state the week of August 20th. <br />We would like both of them to be present at the hearing. <br />We will continue to provide the weekly reports on the activities on site. Please let us know if the <br />postponement is acceptable. We appreciate your consideration of this matter. <br />Thanks, <br />*, 0?. qf6v� <br />Stan Opperman <br />Vice President <br />Asphalt Paving Co. <br />Cc: Greg Lewicki, P.E. <br />Cc- en Langenfeld, P�.}E..1�L <br />LIfAPA Halbn.l A,ph.h PAvmRt Avae W m <br />Colorado <br />PrommAsnl Aawc4lbn <br />p..hw M..ww V W <br />
The URL can be used to link to this page
Your browser does not support the video tag.