Laserfiche WebLink
History of C-1982-056 <br />Coal has historically been mined under other approved permits by surface methods on the dip <br />slopes, where overburden thickness allows for economic extraction within Twentymile Park <br />around its margins, and where folding has elevated a major coal seam within the basin. Foidel <br />Creek Mine is currently the only producing underground operation within Twentymile Park. The <br />mine is a longwall operation, using continuous miners for entry and development work only. <br />The permit area encompasses approximately 22,607 acres. The area presently approved to be <br />disturbed is 773.00 acres, and the area approved to be affected is 19,961.33 acres. <br />USGS Quadrangle maps of Milner and Rattlesnake Butte cover the majority of the permit area. <br />Disturbed areas of the mine include the main surface facilities area along Foidel Creek and <br />numerous smaller outlying facilities. These mine -related facilities result in 742.9 total disturbed <br />acres (2018 ARR). The main mine facilities lie in Sections 29, 31, 32, TSN, R86W of the 6th <br />Principal Meridian and are located in, and adjacent to, a strip pit excavated originally by <br />Colorado Yampa Coal Company's (CYCC) surface mining operation (No. C1981-071). Other <br />facilities currently within the permit area, but separate from the main portal facility area, include <br />the Fish Creek Borehole (FCB) facility, the Southwest ventilation facility (SW vent), the Eastern <br />Mining District ventilation facility (EMD vent), the Eastern Mining District dewatering facility <br />(TORT borehole), the 18 -Right Escape Shaft and MAC borehole, the 18 -Left Ventilation <br />boreholes and MAC borehole, the 6 -Main North Ventilation Shaft, the 6 -Main North escape <br />shaft and supply boreholes, the 6 -Main North reservoir, the 16 -Left Utility Borehole, the <br />Sandstones substation and Barricade chamber, the Fish Creek Tipple (FCT) facility, the Eastern <br />Mining District grout hole pad, and various roads and waterlines throughout the permit area. <br />The Fish Creek Borehole (FCB) is located on Fish Creek approximately two miles northwest of <br />the main facility area in Section 25, TSN, R87W. The FCB facility consists of two dewatering <br />boreholes, an inactive ventilation shaft that has been reconfigured to a mine water borehole, three <br />treatment ponds, associated roads, a substation, a utility building, and water treatment <br />equipment. The SW vent was reclaimed in 1996 and is located in Section 36, TSN, R87W. The <br />EMD vent facility is located in Section 14, TSN, R86W and consists of two ventilation shafts <br />(intake air and return air), intake air heating unit, associated buildings, powerlines, and fuel tank. <br />The 10 Right boreholes (formerly referred to as the EMD borehole) disturbed area is located in <br />Section 21, TSN, R86W and consists of two boreholes, a pump building, several buried water <br />lines, topsoil stockpiles, and a graveled pad. The Sandstones substation in Section 20, TSN, <br />R86W no longer serves as a power drop to the mine, but the pad was utilized for a thickener <br />underflow borehole in 2017. The nearby Barricade chamber (formerly referred to as the North <br />Escape Shaft) has no facilities but exists as a completed three-foot diameter shaft that has been <br />capped with a temporary steel cap. The shaft at the Barricade chamber is used to direct water <br />back into the mine as a part of the mine water system. <br />The Fish Creek Tipple (FCT) facility is located approximately five miles northeast of the main <br />portal area in Section 2, TSN, R86W, about seven miles downstream on Fish Creek from the <br />FCB facility. It was originally permitted separately under permit No. C1981-036 but since has <br />been incorporated into the Foidel Creek permit No. C-1982-056. It consisted of a rail load out, <br />crushing and screening equipment, conveyors, stockpile areas, and a sediment control system of <br />Foidel Creek Mine 6 August 10, 2018 <br />