Laserfiche WebLink
Table of Contents <br />Introduction <br />Proposed Decision <br />The Review Process <br />Description of the Environment <br />Stipulations <br />Part A - Findings required by Section 2.07.6(2) <br />Part B - Findings required by Rule 4 <br />I. Roads - Rule 4.03 <br />II. Support Facilities - Rule 4.04 <br />III. Hydrologic Balance - Rule 4.05 <br />IV. Topsoil <br />V. Sealing of Drilled Holes and Underground Openings <br />VI. Use of Explosives <br />VII. Disposal of Excess Spoil <br />VIII. Coal Mine Waste Banks <br />IX. Coal Mine Waste <br />X. Backfilling and Grading <br />XI. Reve - eta <br />XII. Post -mining Land Use <br />XIII. Protection of Fish. Wildlife and Related Environmental Values <br />XIV. Protection of Underground Minin <br />XV. Subsidence Control <br />XVI. Concurrent Surface and Underground Mining <br />XVII. Operations on Alluvial Vallev Floors <br />XVIII. Operations on Prime Farmland <br />XIX. Mountaintop Removal <br />XX. Operations on Steep Slopes <br />XXI. In Situ Processing <br />Foidel Creek Mine 2 August 10, 2018 <br />3 <br />3 <br />4 <br />5 <br />18 <br />18 <br />27 <br />27 <br />28 <br />28 <br />29 <br />29 <br />30 <br />30 <br />30 <br />31 <br />31 <br />31 <br />33 <br />33 <br />34 <br />34 <br />37 <br />37 <br />49 <br />49 <br />49 <br />49 <br />