My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-10_GENERAL DOCUMENTS - C1982056
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1982056
>
2018-08-10_GENERAL DOCUMENTS - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2018 11:05:27 AM
Creation date
8/9/2018 11:04:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
General Documents
Doc Date
8/10/2018
Doc Name Note
For (RN7)
From
DRMS
To
Twentymile Coal, LLC
Permit Index Doc Type
Findings
Email Name
TNL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The majority of this area falls under areas previously mined/affected in the Northern and Eastern <br />Mining District. An additional 114 previously-unmined acres were approved to be mined. This <br />114 acres is within the 150 acres previously approved to be affected with PR -11. However, with <br />the approval of PR -10, the total approved affected area was reduced by 36 acres. Portions of <br />Fish Creek, Foidel Creek, and Routt County Road No.33 are to be undermined. Coal production <br />is not approved to increase beyond the rate of 12,000,000 tons per year. <br />Revisions to the Permit <br />Minor Revisions, Technical Revisions, and Bond Release approvals which have been made to <br />the Foidel Creek Mine permit since the last renewal (RN06) are listed below. <br />Revision No. <br />Description <br />Issuance <br />Date <br />Liability <br />Change <br />TR90 <br />Thickener Underflow Boreholes & Pipelines. <br />7/5/2018 <br />$62,931.27 <br />TR89 <br />Stoker Coal Handling Modifications <br />6/7/2018 <br />$44,639.81 <br />MR309 <br />Cold Storage Shed <br />5/18/2018 <br />$18,190.84 <br />MR308 <br />Coal Transfer to Twentymile <br />1/29/2018 <br />none <br />TR85 <br />Hydrologic Monitoring Reductions. <br />8/24/2017 <br />none <br />TR88 <br />SWMD 1SW and WMD 12 -Left Thickener <br />Underflow Boreholes, Pump Boost Station, and <br />Pipelines <br />7/27/2017 <br />$31,839.12 <br />MR307 <br />Thickener Underflow Borehole & Pipelines 1SW & <br />12 -left. <br />7/18/2017 <br />none <br />TR87 <br />Thickener Underflow Borehole and Pipeline <br />6/22/2017 <br />$221.28 <br />MR306 <br />Sandstone Sub Thickener Underflow Borehole and <br />Pipeline <br />3/17/2017 <br />$6,798.00 <br />MR305 <br />Stoker Coal Screening Test. <br />3/7/2017 <br />none <br />MR304 <br />9 -East Additional Utility Boreholes <br />2/23/2017 <br />$12,147.02 <br />MR303 <br />Sandstone Sub Test Borehole. <br />2/2/2017 <br />$4,582.91 <br />TR86 <br />Thickener Underflow Borehole <br />1/12/2017 <br />$10,350.72 <br />S12 <br />Surety Increase No. 2 (SI -02) <br />9/14/2016 <br />$56,734.18 <br />MR302 <br />9 East Utility Borehole Equipment Pads. <br />8/15/2016 <br />$2,232.39 <br />MR301 <br />Haulroad B-1 Modification. <br />7/27/2016 <br />$1,829.99 <br />MR300 <br />Washplant Modification <br />7/1/2016 <br />$13,361.00 <br />MR299 <br />Second 10RT Pipeline <br />6/30/2016 <br />$3,464.00 <br />MR298 <br />Fish Creek Borehole Flocculant System. <br />6/17/2016 <br />none <br />PR10 <br />Wolf Creek Reserve Development and Mining. <br />6/15/2016 <br />none <br />Foidel Creek Mine 15 August 10, 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.