Pond NHN-002 As -Built <br />Pond Construction and Compliance Demonstrations <br />The as -built drawing for Pond NHN-002 is provided on Map 2.05.3(4)-10 and includes a plan <br />view, cross-sections, stage -storage curve, and spillway details. The principal spillway consists of <br />an 18 -inch diameter pipe with a pair of valved 6 -inch diameter weepholes. The emergency <br />spillway was constructed with native fill material and has a minimum bottom width of 8.1 feet. <br />The principal and emergency spillway discharge pipes are buried approximately 350 feet north <br />from Pond NHN-002 as shown on Map 2.05.3(4)-10. At the outlets, an erosion control structure <br />with plastic liner and 2-12 inch rock was constructed. In accordance with Rule 4.05.18, the outlet <br />structure for Pond NHN-002 was not constructed within the buffer zone for Meehan Draw. <br />SEDCAD was used to analyze hydrology and sedimentology and the demonstration indicates <br />Pond NHN-002 is adequate to store the 10 -YR, 24 -HR storm event, pit pumping and three years <br />of sediment. With the weepholes open, the peak water level is 2.3 feet below the principal <br />spillway riser and 3.4 feet below the emergency spillway. <br />The SEDCAD demonstration for the 25 -YR, 24 -HR storm event indicates that with weepholes <br />closed, Pond NHN-002 will safely convey the peak discharge with 2.0 feet of freeboard from the <br />peak level to the top of the structure. As indicated on the Structure Summary, the peak discharge <br />out of Pond NHN-002 is 9.51 cfs, which is the flow that must be discharged via the 18 -inch <br />diameter principal spillway discharge pipe. SEDCAD culvert calculations show that the <br />maximum capacity for the principal spillway discharge pipes is 13.94 cfs, which is adequate to <br />convey the 9.51 cfs peak pond discharge. <br />Embankment Construction and Stability Analysis <br />Foundation preparation for Pond NHN-002 embankment included removal of vegetation and <br />scarification of the ground. The embankment fill material was free of sod, roots, vegetative <br />matter and frozen soil. Lambert and Associates on-site compaction testing services were utilized <br />on an as -needed basis and their testing methods were in accordance with ASTM Test Method, <br />D2922 and D3017, for Nuclear Moisture Content and Dry Density for accepted material testing <br />practices in the area. All final field density tests indicated 90% or greater relative compaction. <br />Additionally, Lambert and Associates performed a stability analysis of the embankment soil <br />material using "XSTABL" software. Their slope stability analysis considered a cross-section 10 <br />feet high with a 3:1 (horizontal to vertical) slope inclination. This embankment configuration <br />applies only to the theoretical stability assessment, for actual side slopes measurements at <br />specific locations, refer to Map 2.05.3(4)-10. The analysis indicated a theoretical factor of safety <br />for stability of 2.4 for the pond embankment slope and 1.7 for rapid drawdown condition. <br />Appendix 2.05.3(4)-10 Page 1 March 2018 (TR -16) <br />