My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-07-02_PERMIT FILE - C2010089A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2010089
>
2018-07-02_PERMIT FILE - C2010089A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2018 9:22:39 AM
Creation date
8/9/2018 9:07:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089A
IBM Index Class Name
PERMIT FILE
Doc Date
7/2/2018
Doc Name
Ponds, Impoundments and Diversions
Section_Exhibit Name
Section 2.05.3(4)
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Linear detention and filtering structures that include filter fence, straw bale barrier, brush <br />barrier, and filter berms; <br />5. Measures used in conjunction with overland conveyances including check dams, <br />sediment traps, straw wattles, and water level spreaders; <br />All surface mining operations will be conducted to achieve the effluent limitations of 4.05.2(7) <br />for all mixed drainage when it leaves the permit. Sedimentation ponds or impoundments will be <br />constructed before creating new disturbances, unless approved drainage diversions or other <br />surface water control structures are installed. The as -built for Pond NHN-001 is located in <br />Appendix 2.05.3(4)-6 and the as -built for the Pond NHN-001 collection ditches is located in <br />Appendix 2.05.3(4)-7. A new design for Pond NHN-002 and its collection ditches is located in <br />Appendix 2.05.3(4)$ and the as -built for Pond NHN-002 is located in in Appendix 2.05.3(4)-10. <br />Finally, the design for the NHN-001 East Ditch Extension is located in Appendix 2.05.3(4)-11. <br />Culverts Design Parameters <br />Culvert designs utilizing SEDCAD software are provided in Appendix 2.05.3(3)-l. Sub - <br />watershed areas were created for each of the areas flowing to the individual culverts. For <br />disturbed areas, a curve number of 86 was used in SEDCAD for bare soils in hydrologic soil <br />group B. All ditches were designed in accordance with applicable regulations in 4.05.3. <br />Ditch Designs <br />The main collection ditches in the permit area are the NHN-001 East and West Ditches and the <br />NHN-002 South Ditch. These ditches are used to transport runoff into Sedimentation Ponds <br />NHN-001 and NHN-002 for treatment in accordance with the requirements of applicable <br />regulations. The location and drainage area of these ditches can be found on Map 2.05.3(4)-l. <br />Ditch designs are presented in several different appendices and are further outlined below by the <br />appropriate stationing on the ditches. <br />Sedimentation Ponds <br />In accordance with Rule 4.05.2, NHN will use Ponds NHN-001 and NHN-002 to prevent, to the <br />extent possible, additional contributions of sediment to stream flow or runoff outside the permit <br />area due to mining disturbance. In accordance with Rule 4.05.6(3) each sedimentation pond is <br />designed, constructed, and maintained to: <br />a. Provide storage for runoff or inflow into the pond as a result of a 10 -year, 24-hour <br />precipitation event and to meet all applicable State and Federal regulations for effluent <br />limitations before discharge from the permit. The characteristics of the mine site, <br />reclamation procedures, and sediment control practices are also considered in the design. <br />b. Provide adequate sediment storage volume in compliance with the DRMS regulations. <br />c. Install an appropriate non -clogging dewatering device to maintain a 10 -year, 24-hour <br />storage volume. <br />Section 2.05.3(4) Page 2 March 2018 (TR -16) <br />
The URL can be used to link to this page
Your browser does not support the video tag.