Laserfiche WebLink
71, <br /> 14802 W 44`"Avenue <br /> Golden,Colorado 80403 <br /> Office: 303-279-6611 <br /> Fax: 303-279-6216 <br /> www.ape.us.com <br /> The Sign of Quality <br /> August 6, 2018 <br /> Department of Natural Resources <br /> Division of Reclamation, Mining and Safety <br /> 1313 Sherman Street, Room 215 <br /> Denver, CO 80203 <br /> RE: Status Report; APC Construction Co—Ralston Quarry <br /> On Friday, July 27t" Ames construction completed a week's worth of grading operations. This moved <br /> loose material from the upper portion of the slide and removed material that was placed in order to <br /> create a haul road for the scrapers. The work in the slide area was recommended by Ground <br /> Engineering and appears to have been successful as we have seen no movement in the slide area since <br /> completion of this work. Water continues to leach out of the lower part of the slide area. <br /> On Monday, August 6t", ground Engineering had a geologist on site. He toured the areas adjacent and <br /> above the slide area and did not note anything unusual. He also evaluated the slide area and marked <br /> locations for five test holes that will be drilled on Tuesday, August 7t" <br /> Thanks, <br /> ki(f. � <br /> Stanley C. Opperman <br /> Vice President—Operations <br /> APC Construction Co., LLC <br /> �• s, } •. `'C�rfrn- _cam- Pnemam Aswcuon <br />