My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-06_GENERAL DOCUMENTS - C1981019
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2018-08-06_GENERAL DOCUMENTS - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2018 9:22:45 AM
Creation date
8/7/2018 9:10:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
8/6/2018
Doc Name Note
Revised
From
DRMS
To
Colowyo Coal Company
Type & Sequence
RN7
Permit Index Doc Type
Findings
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
natural barriers are not necessary. One slide has occurred within the permit boundary along the <br />haul road and has been repaired. Numerous small fires have also occurred within the Mine permit <br />boundary stemming from lightning strikes and downed power lines from high winds. All fires were <br />quickly contained and extinguished. <br />There has been no adverse effect on public property, health, safety, or the environment due to <br />slides and damage. <br />XI. Contemporaneous Reclamation - Rule 4.13 <br />The Permit is in compliance with Rule 4.13. Reclamation occurs as contemporaneously as <br />practicable with mining operations, as further discussed in Section XII below. <br />XII. Backfilling and Grading - Rule 4.14 <br />The Permit is in compliance with Rule 4.14. <br />A. Operations and Reclamation Plans <br />Colowyo's operations plan is found in Section 2.05.3 of the PAP (Volume 1 for the East Pit, West <br />Pit, Section 16 Pit, Facilities Area and Gossard Loadout; Volume 12 for South Taylor Pit; Volume <br />15 for Collom Pit). Maps 23, 23A, and 23B of the PAP contain the mine plan. Section 2.05.4 of <br />the PAP contains the reclamation plan, and Section 4.14 contains the performance standards for <br />backfilling and grading. <br />During the approval process of Permit Revision No. 2, the Division added Stipulation 2 regarding <br />the Lower Wilson mining area to the operations and reclamation plan at the Mine. <br />B. Contemporaneous Reclamation <br />Section 4.13 of the PAP contains information on contemporaneous reclamation for Colowyo's <br />multi -seam operations, with additional information found in Sections 2.05.4 and 4.14. Backfilling <br />and grading cannot begin with multi -seam operations until the lowest seams are mined. Therefore, <br />backfilling and grading cannot be completed within 180 days of the removal of the uppermost coal <br />seams. Also, the number of spoil ridges may exceed four at multi -seam operations. In addition, <br />variances from contemporaneous reclamation have been granted to accommodate high -wall <br />mining operations. <br />Based on the nature of the South Taylor Pit and Collom Pit, which are also a multi -seam operation, <br />backfilling and grading cannot be completed within 180 days of the removal of the uppermost coal <br />seam and the number of spoil ridges may exceed four. The Division has granted Colowyo a <br />variance for contemporaneous reclamation for the South Taylor and Collom Pit. <br />Revised Proposed Decision and Findings of Compliance August 2018 <br />Permit Renewal No. 7 P a g e 145 <br />
The URL can be used to link to this page
Your browser does not support the video tag.