Laserfiche WebLink
MR -139 MR -139 updated Map 28 - Topsoil Handling -South Area of the PAP to correct <br />topsoil replacement locations. <br />MR -140 MR -140 provided the as -built drawing for the Work Area Pond to reflect the <br />reconstruction of the primary spillway and the removal of the de -watering valve. <br />MR -141 MR -141 updated Exhibit 23A of the PAP to include in -pit drilling locations. <br />MR -142 MR -142 incorporated two new substation locations and two new topsoil windrow <br />locations. <br />MR -143 MR -143 incorporated a geotechnical drilling program related to the Collom haul <br />road. <br />MR -144 MR -144 revised the footprint for Topsoil Stockpile 16C and direct haul of topsoil <br />from Topsoil Pile 16I. <br />MR -145 MR -145 approved a coal stockpile located within the West Pit to allow <br />advancement of spoil grading. <br />MR -146 MR -146 approved a stream buffer zone variance for historical and pre-existing <br />mine related structures in Taylor Creek, Good Spring Creek, and the West Fork of <br />Good Spring. <br />MR -147 MR -147 adjusted ground clearance under sections of power lines to their required <br />height. <br />MR -148 MR -148 incorporated the as-builts designs for three stock ponds constructed in the <br />West Pit reclamation during 2015. <br />MR -149 MR -149 incorporated a cumulative bond schedule for construction of the Collom <br />Haul Road in the PAP. <br />MR -150 MR -150 incorporated geotechnical drilling at fifteen sites within the disturbance <br />footprint of the Collom Facilities area, Collom Haul Road, and at the Collom Haul <br />Road/County Road 51 crossing. <br />MR -151 MR -151 documented ground disturbing activities associated with an emergency <br />access road to replace a broken power pole <br />MR -152 MR -152 documented ground disturbing activities associated with the Inactive Mine <br />Reclamation Program drilling project to abate the underground Axial Mine Fire. <br />MR -153 MR -153 revised the in -pit dill hole locations within the South Taylor Pit. <br />Revised Proposed Decision and Findings of Compliance August 2018 <br />Permit Renewal No. 7 Page 19 <br />