My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-06_GENERAL DOCUMENTS - C1981019
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2018-08-06_GENERAL DOCUMENTS - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2018 9:22:45 AM
Creation date
8/7/2018 9:10:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
8/6/2018
Doc Name Note
Revised
From
DRMS
To
Colowyo Coal Company
Type & Sequence
RN7
Permit Index Doc Type
Findings
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MR -139 MR -139 updated Map 28 - Topsoil Handling -South Area of the PAP to correct <br />topsoil replacement locations. <br />MR -140 MR -140 provided the as -built drawing for the Work Area Pond to reflect the <br />reconstruction of the primary spillway and the removal of the de -watering valve. <br />MR -141 MR -141 updated Exhibit 23A of the PAP to include in -pit drilling locations. <br />MR -142 MR -142 incorporated two new substation locations and two new topsoil windrow <br />locations. <br />MR -143 MR -143 incorporated a geotechnical drilling program related to the Collom haul <br />road. <br />MR -144 MR -144 revised the footprint for Topsoil Stockpile 16C and direct haul of topsoil <br />from Topsoil Pile 16I. <br />MR -145 MR -145 approved a coal stockpile located within the West Pit to allow <br />advancement of spoil grading. <br />MR -146 MR -146 approved a stream buffer zone variance for historical and pre-existing <br />mine related structures in Taylor Creek, Good Spring Creek, and the West Fork of <br />Good Spring. <br />MR -147 MR -147 adjusted ground clearance under sections of power lines to their required <br />height. <br />MR -148 MR -148 incorporated the as-builts designs for three stock ponds constructed in the <br />West Pit reclamation during 2015. <br />MR -149 MR -149 incorporated a cumulative bond schedule for construction of the Collom <br />Haul Road in the PAP. <br />MR -150 MR -150 incorporated geotechnical drilling at fifteen sites within the disturbance <br />footprint of the Collom Facilities area, Collom Haul Road, and at the Collom Haul <br />Road/County Road 51 crossing. <br />MR -151 MR -151 documented ground disturbing activities associated with an emergency <br />access road to replace a broken power pole <br />MR -152 MR -152 documented ground disturbing activities associated with the Inactive Mine <br />Reclamation Program drilling project to abate the underground Axial Mine Fire. <br />MR -153 MR -153 revised the in -pit dill hole locations within the South Taylor Pit. <br />Revised Proposed Decision and Findings of Compliance August 2018 <br />Permit Renewal No. 7 Page 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.