My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-06_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2018-08-06_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2018 9:22:45 AM
Creation date
8/7/2018 7:16:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
8/6/2018
Doc Name Note
Revised
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Colowyo Coal Company
Type & Sequence
RN7
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TR -120 TR -120 incorporated the as -built drawings and supporting documentation for the <br />Section 25 Pond, Section 36 Pond, Middle Pond and the Coal Stockpile Pond. <br />3.4 Status of Minor Revisions <br />This section identifies Minor Revisions (MR) processed since the Findings of Permit Renewal No. <br />6 (May 20, 2013). <br />MR -126 MR -126 was withdrawn. <br />MR -127 MR -127 added Exhibit 23 to the PAP and new in -pit drilling locations within the <br />South Taylor Pit. <br />MR -128 MR -128 revised Exhibit 2 with the list of individuals with current and historical <br />site control of the Colowyo Mine. <br />MR -129 MR -129 updated Rule 4 of the PAP for the South Taylor/Lower Wilson area to <br />incorporate formatting revisions. <br />MR -130 MR -130 documented a wildland fire near parcel ST001, which is east of the South <br />Taylor Pit. <br />MR -131 MR -131 revised the alignment of the South Taylor haul road south of the West Pit. <br />MR -132 MR -132 revised two parts of the PAP, including Map 1, Surface Ownership, and <br />Exhibit 1, Item 9, which is a table of surface owners. <br />MR -133 MR -133 provided an addendum to Exhibit 21, Item 1, to the report title, <br />"Geotechnical Design and Operational Consideration for Highwall Mining, South <br />Taylor Pit G78 and E/D2 Seams, and West Pit F, E, D2, and CSeams". <br />MR -134 MR -134 updated Maps 18 and 18A of the PAP showing pre -mining topography. <br />MR -135 MR -135 updated Colowyo's permit text to describe the construction and <br />maintenance of fence on BLM lands. <br />MR -136 MR -136 revised the design of Prospect Pond. <br />MR -137 MR -137 revised the Reclamation Cost Estimate in the PAP per RN -06 and TR -99. <br />MR -138 MR -138 updated information regarding ownership and control of the Colowyo <br />Mine. <br />Revised Proposed Decision and Findings of Compliance August 2018 <br />Permit Renewal No. 7 Page 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.