Laserfiche WebLink
July 25, 2018 C-1992-081/Hayden Gulch Loadout TNL <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 0 <br />Number of Complete Inspections this Fiscal Year: 1 <br /> <br /> Page 3 of 4 <br /> <br />doing to grading once removed. The crossing at Hwy 40 does require a permit and traffic control through CDOT. <br /> <br /> <br /> <br />TOPSOIL – Rule 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br /> Topsoil piles were observed and appear stable and are well vegetated. Topsoil pile near the rail loop needs <br />a marker. <br /> <br />DOCUMENTS RECEIVED <br />OTHER (SPECIFY) <br /> <br /> <br />ENFORCEMENT ACTIONS/COMPLIANCE <br /> <br />No enforcement actions were initiated as a result of this inspection, nor are any pending. <br /> <br />PHOTOGRAPHS <br /> <br /> <br /> Rail on Hwy 40 to be removed Wetland area near Hwy 40 rail crossing <br />