My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-07-31_REVISION - C1981041
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981041
>
2018-07-31_REVISION - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 1:21:09 PM
Creation date
7/31/2018 1:12:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
7/31/2018
Doc Name
Notice of Inspection
From
DRMS
To
Rudy and Ethel Fontanari cc; Kendra N. Beckwith
Type & Sequence
SL11
Email Name
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO <br />Division of Reclamation, <br />j&7 Mining and Safety <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />July 31, 2018 <br />Rudy and Ethel Fontanari <br />3316E3/4Road <br />Clifton, CO 81520 <br />RE: Roadside Portals Mine, C-1981-041 <br />Bond Release Application No. 11 (SL -11) <br />Dear Mr. Fontanari <br />The Division of Reclamation, Mining and Safety sent a letter to your address via certified <br />mail on June 1, 2018. The letter was a notification of a bond release inspection of the <br />Roadside Portals Mine beginning on June 27, 2018 at 08:30 AM. The Postal Service <br />returned the letter to the Division on June 29, 2018. The Postal Service returned the letter <br />to the Division because it was unclaimed. <br />The Division of Reclamation, Mining and Safety will be conducting a second SLI 1 bond <br />release inspection of the Roadside Portals Mine the week of August 13, 2018. The <br />second SLI 1 inspection will focus on Portions of your property that lie within the current <br />DRMS permit boundary of the Roadside Portals Mine. The second SLI 1 inspection is <br />expected to take three days. The purpose of the second SL11 inspection will be to <br />evaluate reclamation on your property, as well as undisturbed portions of your property <br />that overlie underground mine workings. Rule 3.03.2(2) of the Rules and Regulations of <br />the Colorado Mined Land Reclamation Board for Coal Mining requires that you be <br />notified prior to the inspection, so that you may attend the inspection. If you wish to <br />attend the inspection, please contact me for specific details by Wednesday August 8, <br />2018. If you have questions or are in need of additional information, please contact me. <br />Sincerely, <br />*JT �4� <br />Clayton Wein <br />Environmental Protection Specialist <br />303-866-3567 x8144 <br />cla3qon.wein(&,state.co.us <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us <br />John W. Hickenlooper, Governor I Robert W. Randall, Executive Director I Virginia Brannon, Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.