My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-07-23_PERMIT FILE - M2018035
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2018035
>
2018-07-23_PERMIT FILE - M2018035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 10:03:53 PM
Creation date
7/23/2018 4:17:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018035
IBM Index Class Name
PERMIT FILE
Doc Date
7/23/2018
Doc Name
Adequacy Review Response
From
SEMA Construction
To
DRMS
Email Name
JLE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to the surface and ground water systems including proposed dewatering, <br /> sediment-containment or chemical treatment systems,storm water run-off <br /> controls, and ground water points of compliance: <br /> Neither ground nor surface water will be intercepted or disturbed by the proposed <br /> borrow pit mining and reclamation activities. If necessary, a Stormwater <br /> Management Permit will be secured from the Colorado Department of Public <br /> Health and Environment, Water Quality Control Division(WQCD). In any event, <br /> SEMA will implement its Corporate Stormwater Management Plan which will <br /> include site appropriate Best Management Practices (BMP). A Stormwater <br /> Management Plan will be in place prior to site disturbance to ensure storm water <br /> is properly routed around disturbed areas, and/or properly controlled from the site <br /> as storm water runoff. (If required,the Stormwater Management Plan will also <br /> comply with agency requirements.) <br /> (A Stormwater Permit is only required where an operation has the <br /> possibility of a discharge to state waters from storm water that may come <br /> into contact with any overburden, raw. materials, intermediate products, <br /> finished products, by products or waste products located at the site of <br /> such operations) <br /> (j) Description how the Operation will comply with applicable Colorado <br /> water laws and regulations governing injury to existing water rights: <br /> • The operator/applicant will comply with Colorado water quality laws and <br /> regulations governing injury to existing water rights. It is not anticipated <br /> that any water will be encountered. If ground water is encountered,the <br /> proper steps at the State Engineers office will be complied with. <br /> • Any water used for fugitive dust control will be purchased. <br /> (k) If refuse and acid or toxic producing materials ware exposed during <br /> mining,describe how they shall be handled and disposed of in a manner that <br /> will control unsightliness and protect the drainage system form pollution: <br /> No acid or toxic materials will be used or encountered on this site. <br /> (1) Description what measures will be taken to minimize disturbance to <br /> the hydrologic balance,prevent off-site damage, and provide for a stable <br /> configuration of the reclaimed area consistent with the proposed future land <br /> use: <br /> • The hydrologic balance will not be influenced by removal of borrow <br /> material. The initial preparation of the surface before extraction of borrow <br /> material will consist of stripping the topsoil and placing topsoil in a <br /> stockpile for use later during reclamation. Front-end loaders, scrapers, <br /> excavators or other suitable equipment will be used in order to remove <br /> topsoil and borrow material as quickly as possible followed by site <br /> reclamation. The short duration of the borrow operation and timely site <br /> 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.