Laserfiche WebLink
E) ' AREA OF CONSTRUCTION'SITE <br /> Total area of project site 20 Area of project site to undergo disturbance 18.2 <br /> Note:aside from clearing,grading and excavation activities d-sturbed areas also include areas receiving overburden(e g.,stockpiles),demolition areas,and areas <br /> w th heavy equipment/vehicle traffic and storage that disturb existing vegetative cover <br /> ?otal disturbed area of Larger Common Plan of Development or Sale If app Icab e <br /> f i e~, noot covered by th:sappNeatiairl <br /> Provide both the total area of the construction site,and the area that will undergo disturbance,in acres Note:aside from clearing,grading and excavation <br /> activities,disturbed areas also include areas receiv rig overburden(e.g,stockpiles),demolition areas,and areas with heavy equipment/veh-cle traffic and storage <br /> that disturb existing vegetative cover(see construction activity descript on under the APPLICABILITY sect on on page 1).If the project is pan of a larger common <br /> plan of development or sale(see the definition under the APPLICABILITY section on page 1),the disturbed area of the total plan must also be included <br /> F) NATURE OF CONSTRUCTION ACTIVITY <br /> Check the appropriate box(s)or provide a beef description that Indicates the genera nature of the construct cn activities (The full descript on of activities must be <br /> Included In the Stormwater Management Plan.) <br /> Single Family Residential Development <br /> Multi Family Residential Develcpment <br /> Commercial Development <br /> Oil and Gas Production and/or Exploration(including pad sites and associated Infrastructure) <br /> aHighway/Road Development(not including roadways assail ated with commercial or residential deveicpmenti <br /> Other—Description <br /> G) ANTICIPATED CONSTRUCTION SCHEDULE <br /> August 1,2018 October 31, 2019 <br /> Construction Start Date Final Stabilization Date: <br /> • Construction Start Date-This Is the day you expect to begin ground disturbing activities,including grubbing,stockpiling,excavating,demolition. <br /> and grading activities <br /> • Final Stabilization Date•:n terms of permit coverage,th,s is when the site is finally stabilized.This means that all grourd surface disturbing <br /> activlt es at the site have been completed,and all disturbed areas have been either built on,paved,or a uniform vegetative cover has been <br /> established with an Individual plant densay of at least 70 percent of pre-disturbance levels.Permit coverage must be maintained until the site is <br /> finally stabilized.Even if you are only doing one part of the project,the estimated final stabilization date must be for the overall project. <br /> If permit coverage is sti I required once your part Is completed,the Permit certification may be transferred or reassigned to a new responsible <br /> entity(s). <br /> H) RECEIVING WATERS(If discharge is to a ditch or storm sewer,include the name of the ultimate receiving waters) <br /> immediate Receiving Water(s)- Coal Creek <br /> Platte River <br /> Ultimate Receiving Water(s) S. ------------ <br /> Identify the receiving water of the stormwater from your site.Receiving waters are any waters of the State of Colorado This includes all water courses,even if they <br /> are usually dry.If stormwater from the construction site enters a ditch or storm sewer system,identify that system and indicate the ultimate receiving water for the <br /> ditch or storm sewer.Note:a stormwater discharge permit does not allow a discharge into a ditch or storm sewer system without the approval of the owner/ <br /> operator of that system <br /> SW Consln tlon AOp:iulion for SEMA Construction,fnc. 07+1312019 ,gyp y ti <br />