Laserfiche WebLink
e <br /> x <br /> 3 <br /> Gresinti Farms Gravel Pit Bank Stabilization Project Figure 2 <br /> • Data Point Photo Point Existing Conditions <br /> Ordinary High Water Mark(0.38 ac) <br /> Wetland(0.02 ac) N Prepared far:Transit Mix Concrete <br /> FR <br /> Project Area Lo±npany � <br /> 1 p � �� m:File:7141 Figure 2. xd(WO FRO <br /> Image Source_Dig calGlotieV,March 2,2016 <br /> JUL 23 2018 <br /> 10 <br /> DMSION OF RECLAMATION <br /> Ir UNG AND SAFETY <br />