Laserfiche WebLink
Example Letter to Owners of Structures within 200 ft. of the Affected <br /> Land <br /> Town of Limon <br /> Structure Agreement <br /> This letter has been provided to you as the owner of a structure on or within two hundred (200) feet of a <br /> proposed mine site. The State of Colorado, Division of Reclamation, Mining and Safety ("Division") <br /> requires that where a mining operation will adversely affect the stability of any significant, valuable <br /> and permanent man-made structure located within two hundred (200) feet of the affected land, the <br /> Applicant shall either: <br /> a) Provide a notarized agreement between the Applicant and the Person(s)having an <br /> interest in the structure, that the Applicant is to provide compensation for any damage to the structure; <br /> or <br /> b) Where such an agreement cannot be reached, the Applicant shall provide an appropriate <br /> engineering evaluation that demonstrates that such structure shall not be damaged by activities <br /> occurring at the mining operation; or <br /> c) Where such structure is a utility, the Applicant may supply a notarized letter, on utility <br /> letterhead, from the owner(s) of the utility that mining and reclamation activities, as proposed, will <br /> have "no negative effect" on their utility. (Construction Materials Rule 6.3.12 and Rule 6.4.19 and <br /> Hard Rock/Metal Mining Rule 6.3.12 and Rule 6.4.20) <br /> The Colorado Mined Land Reclamation Board("Board') has determined that this form, ifproperly <br /> executed, represents an agreement that complies with the Construction Materials Rule 6.3.12(a), Rule <br /> 6.4.19(a), and C.R.S. §34-32.5-115(4)(e) and with Hard Rock/Metal Mining Rule 6.3.12(a), Rule <br /> 6.4.20(a) and C.R.S. §34-32-115(4)(d). This form is for the sole purpose of ensuring compliance with <br /> the Rules and Regulations and shall not make the Board or Division a necessary part to any private <br /> civil lawsuit to enforce the terms of the agreement or create any enforcement obligations in the Board <br /> or the Division. <br /> The following structures are located on or within 200 feet of the proposed affected area. <br /> Structure(s) Name and/or Description: <br /> 1. <br /> CERTIFICATION <br /> The Applicant, Town of Limon by , does herby certify that <br /> shall be compensated for any damage from the proposed mining operation to the above listed structures <br /> 70 <br />