Laserfiche WebLink
(iv) Tree and shrubs planting: <br /> No trees or shrubs will be planted. None exist on the mine site and the post mining land use is <br /> rangeland. <br /> (v) Topsoil replacement depth: <br /> Topsoil will be replaced to an average depth of 6 inches. <br /> 39 <br />