Laserfiche WebLink
adequate ventilation and that is not <br /> exposed to the weather. If batteries <br /> are spent, they need to be recycled <br /> offsite with an authorized vendor. <br /> Kerosene cans and POL The operator will maintain a Remove items from the site (in <br /> containers/tanks are being clean, safe area. All fuel, oil and accordance with applicable <br /> 4 improperly stored and hydraulic oil storage containers regulations) or construct <br /> managed at the site. will have containment containment structures for proper <br /> structures. storage and management. <br /> Propane tanks are being The operator will maintain a Propane tanks at an active site <br /> improperly stored and clean, safe area. should be stored in an upright <br /> 5 managed at the site. position and in a location and <br /> manner that is protected from <br /> incidental impact by equipment <br /> and vehicles. <br /> Trash, tires and other The operator will maintain a Pick up all items and dispose of or <br /> 6 mining related materials clean, safe area. recycle properly at an offsite, <br /> are being improperly stored authorized transfer station or <br /> and managed at the site. landfill. <br /> Excess pond liner littered The operator will maintain a Pick up the pond liner. If it is to be <br /> along the western region of clean, safe area. The Plan of used in conjunction with the <br /> the site where portions of Operations delineates a specific mining operations, then properly <br /> 7 the liner are stored outside area that is to be utilized with store it out of the weather and in <br /> the authorized operational the mining operation. one location. Otherwise, dispose of <br /> boundary. or recycle properly at an offsite, <br /> authorized transfer station or <br /> landfill. <br /> Stockpiles and Topsoil to The Plan of Operations As this is storage of material only, <br /> the NW and SW are delineates a specific area that is the material needs to be moved <br /> located outside the to be utilized with the mining back inside the authorized plan of <br /> authorized operational operation. operations boundary.No <br /> 8 boundary. disturbance of the native ground <br /> underlying the storage piles is <br /> authorized at this time. Once the <br /> piles have been relocated, the <br /> unauthorized storage area will need <br /> to be seeded. <br /> Stockpiles along the NE Minimum setback for piles Move the piles to provide a setback <br /> trench are< 1 foot from the from any cuts is 10 feet. The of a minimum of 10 feet from the <br /> 9 trench bank and contain operator will maintain a clean, cut. Reference the Geophysical <br /> steep slopes of repose safe area. Stability report prepared for this <br /> based on the type of operation,to ensure that the side <br /> material. slopes are stable. <br /> The site shows evidence of During a non-operational Based on the observed conditions <br /> abandonment, with no period,monitoring will be at the site,the monitoring has not <br /> apparent monitoring taking conducted once per week or occurred. Provide all <br /> 10 place. every other week. documentation regarding the non- <br /> operational timeframe, as it applies <br /> to the authorized Plan of <br /> Operations. <br />