Laserfiche WebLink
P�a,ET3T UwDIPAR-ENT F <br /> O Minerals Plan of Operations Inspection <br /> � 9 <br /> 0 U.S. Department of the Interior <br /> Bureau of Land Management <br /> H ~� Royal Gorge Field Office <br /> The BLM has conducted an inspection of your operations,which concludes whether the documented operations on file with BLM are <br /> compliant or noncompliant. Any non-compliance issues are reported in the Additional Actions Necessary section of this inspection. <br /> Operation Type: M 3809 w/occupancy 113809 w/o occupancy REEEIVE15 <br /> Date: 06/22/18 Operation Name: Field of Dreams <br /> Time: 11:30 Operator: Gold Tamers,LLC. JUL I I Md <br /> Weather: Sunny Case Number: COC73930 <br /> CDRMS#: M2009056 DIVISION OF REcLAMATM' <br /> Attendees General MININGANDSAFETY <br /> BLM: Stephanie Carter&Amber Sanderson Operation(s) are in compliance with documentation•on file <br /> ❑Yes ®No ❑N/A <br /> Operator(s): Contacted,but not present Operation(s)and disturbance on-site coincide with the <br /> operations and access on file <br /> Other(s): None ®Yes ❑No ❑N/A <br /> Inspection Purpose: ❑ Pre-Operations ® General ❑ Final ❑ Trespass ❑ Complaint <br /> Inspection Items Compliant Non- N/A <br /> Compliant <br /> 1.Method of Operations <br /> Drill,Trench/Surface Excavation/Hi hwall,Underground Excavation _ <br /> a. Drilling ❑ ❑ M <br /> • Pad Construction ❑ ❑ M <br /> • Mud Pits ❑ ❑ M <br /> • Borehole Abandonment/Monitoring Well Conversion ❑ ❑ M <br /> ❑ Complete ❑ Incomplete <br /> • Pad Reclamation ❑ ❑ M <br /> b. Trenching/Surface Excavation/Highwall ® ❑ ❑ <br /> • Trench/Excavation/Highwall Construction ® ❑ ❑ <br /> • Trench/Excavation/Highwall Stability ❑ ❑ ❑ <br /> • Trench/Excavation/Highwall Reclamation ❑ ❑ M <br /> c. Underground Excavation ❑ ❑ M <br /> • Portal Construction ❑ ❑ M <br /> • Blasting Operations ❑ ❑ M <br /> • Portal Reclamation/Conversion of Entry ❑ ❑ M <br /> 2. Site Conditions <br /> a. Material/Waste Rock Management ❑ M ❑ <br /> b. Erosion & Stormwater Control M ❑ ❑ <br /> c. Man-made Structures ❑ M ❑ <br /> d. Weed Management ® ❑ ❑ <br /> e. Safety Conditions ❑ ® ❑ <br /> f. Interim Reclamation ❑ ❑ <br />