Laserfiche WebLink
SSGM <br /> www. sgm-inc.com <br /> July 10, 2018 <br /> Ms.Amy Yeldell <br /> Division of Reclamation <br /> Mining and Safety <br /> 1313 Sherman Street, Room 215 <br /> Denver, CO 80203 <br /> RE: Nolte Pit#1 <br /> Permit#M-2012-016 <br /> Technical Revision Request <br /> Dear Amy, <br /> The purpose of this letter follows your June 11, 2018 letter to Chuck Whiteman regarding the need to <br /> submit a Technical Revision request regarding the following three items discussed as follows: <br /> 1. Reclamation schedule: Prior to October 18, 2018, PLC will have performed the necessary <br /> reclamation in accordance to TR-3 through the installation of 5 rip-rap structures and straw <br /> waddles (within 60 days); and <br /> 2. Reseeding of disturbed areas: As a result of rip rap and straw waddle installation, reseeding of <br /> the disturbed areas will occur through hand broadcasting with the seed mix and per the <br /> densities outlined in TR-3. Hand placement of mulching will also occur over the reseeded areas. <br /> This work will be performed when timing is appropriate;and <br /> 3. Treatment of noxious weeds will be performed in this same time period. We anticipate that <br /> Terra Energy Partners will be eradicating noxious weeds on the corridor that they previously <br /> worked on during this same time period. It is PLC's intent to employ the same subcontractor to <br /> address the remaining areas on Nolte Pit#1. <br /> Upon your receipt and review, if you have any questions, please don't hesitate to call. <br /> Respectfully subm4, M <br /> SGM, <br /> Jeffer im ns <br /> Princip I <br /> GLENWOOD SPRINGS 118 West Sixth St, Suite 200 1 Glenwood Springs, CO 81601 970.945.1004 <br />