Laserfiche WebLink
NO _ _ _, 00 O NO <br /> \ __ -------------- ------- <br /> ___________________ <br /> - - ------------------- 7 <br /> E� <br /> 9g60 - �V g360__ <br /> g8 _ a gd4 985 S n � <br /> 9 <br /> -933 <br /> gd' 932rr— <br /> \\960 --- 51 u-- gE1 510­ <br /> l <br /> 1 <br /> --_- \ ------9770--- <br /> -70--_ <br /> —._—_ <br /> c <br /> t <br /> -----�✓ - - <br /> ZZ <br /> `V `--972 720 <br /> e \, <br /> n — <br /> �� <br /> 95.E <br /> o \\gam_ \ 1 <br /> _ <br /> S ` <br /> ///1 ---- ---— <br /> p O -- e <br /> c --- c <br /> i <br /> LEGEND: ISOPACH LEGEND: ' <br /> RECEIVE' ;.o <br /> � 57i AS—BUILT TOP OF DCF (2016) 0 40 80 FEET DEPTH OF DCF BETWEEN 0'-2' Ir <br /> 2 TOP OF DCF (2018) DEPTH OF DCF BETWEEN 2'-3' JUL 1 1 2018 •••''••••••''• <br /> DEPTH OF DCF GREATER THAN 3' <br /> ' NOTES: <br /> 1. THE AS—BUILT TOP OF DRAIN COVER FILL (DCF) (2016) WAS DEVELOPED BY AMES AS PART OF THE DIVISION OF RECLAMATION <br /> > RECORD OF CONSTRUCTION REPORT FOR THE SQUAW GULCH VALLEY LEACH FACILITY PHASE 1 <br /> COMPLETION, DATED OCTOBER 14, 2016. <br /> APPROVED BY. DISCLAIMER Is CLIENT CRIPPLE CREEK & VICTOR <br /> 0 2. THE ISOPACH OF DCF DEPTH WAS DEVELOPED BY COMPARING THE AS—BUILT SLF SURFACE TO THE JNM NEWFIELDS PRODUCED THE INFORMATION PRESENTED . ewFields GOLD MINING COMPANY <br /> ' AS—BUILT DCF SURFACE. CHECKED BY: ON THIS DRAWING THROUGH THE USE OF AVAILABLE <br /> JNM TECHNICAL INFORMATION AND EXPERIENCE. PROJECT <br /> 3. THE TOP OF SLF (2018) WAS SURVEYED BY FORSIGHT WEST AND PROVIDED TO NEWFIELDS ON JUNE RECEIVING THIS DRAWING DOES NOT GUARANTEE ANY VLF2 RECERTIFICATION <br /> 20, 2018 IN A FILE CALLED "MLE2 VLF Clay Topo 6-18-18.dwg DESIGNED ar: RIGHTS TO EITHER SUCH TECHNICAL INFORMATION OR <br /> JNM EXPERIENCE. ANY MODIFICATION OR ADAPTATION OF TITLE FILENAME <br /> THE DATA OR DRAWING SHAI1 BE AT USER'S RISK DCF AS—BUILT SURVEY AND ISOPACH 106.023.011F <br /> 0 7ZI1ZIB ISSUED FOR RECORD OF CONSTRUCTION REPORT INN INN <br /> � 4. THE TOP OF DCF (2018) WAS SURVEYED BY FORSIGHT WEST AND PROVIDED TO NEWFIELDS ON JULY DRAwN aY: AND WITHOUT ANY LIABILITY OR LEGAL BETWEEN 9650• AND 9750' BENCH DRAWING No. I REVISION <br /> a 10, 2018 IN A FILE CALLED "MLE2 VLF DCF Checks 7-09-18.dwg". ..Vt DATE r DESCRIPTION TECH ENG JNM RESPONSIBILITY TO NEWFIELDS. 1 0 <br />