Laserfiche WebLink
i <br /> NewFields <br /> Perspective. Vision. Solutions. <br /> ' FIELD DAILY PROGRESS REPORT <br /> ' Client: Cripple Creek & Victor Gold Mining Company <br /> Project: VLF2 Geomembrane Recertification <br /> NewFields Project Number: 475.0106.026 <br /> Date: July 5, 2018 <br /> S M T W T F S <br /> Temperature: Low: 48'F to High: 64°F Weather: Mostly Cloudy <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> ' Benjamin Melly 12 <br /> Alex Lewallen 11 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1 Drain Cover Fill Placement <br /> A Cat D6T LGP dozer was used to push and place Drain Cover Fill (DCF) material between 9650' <br /> bench and 9728' elevation in a minimum of two-foot lift. <br /> t1.2 Drain Cover Fill Removal <br /> A Cat 312C L excavator was used to remove DCF from existing Soil Liner Fill (SLF) surface and <br /> existing geomembrane on 9900' bench. <br /> 1.3 Anchor Trench Excavation <br /> A Cat 336F and A Cat 305.5 E mini excavator were used to excavate approximately 30 feet of <br /> anchor trench on the 9900' bench. <br /> 1.4 Geomembrane Removal <br /> No activities during the shift. <br />