Laserfiche WebLink
VNewFields <br /> Perspective.Vision. Solutions. <br /> ' FIELD DAILY PROGRESS REPORT <br /> ' Client: Cripple Creek &Victor Gold Mining Company <br /> Project: VLF2 Geomembrane Recertification <br /> ' NewFields Project Number: 475.0106.026 <br /> Date: July 4, 2018 <br /> ' S M T W i T F S <br /> ' Temperature: Low: 48OF to High: 740F Weather: Partly Cloudy <br /> ' NEWFIELDS PERSONNEL <br /> Name Hours <br /> ' Benjamin Melly 9 <br /> Alex Lewallen 8 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> ' 1.1. Drain Cover Fill Placement <br /> Mine Operations continued to deliver Drain Cover Fill (DCF) from the stockpile to the placement <br /> ' area between 9650' elevation and loading area. A Cat D6T LGP dozer was used to push and place <br /> the DCF material between the 9650'and 9715' elevations in a minimum two-foot lift. <br /> 1.1 Drain Cover Removal <br /> A Cat 312C L excavator completed the removal DCF from existing Soil Liner Fill (SLF) surface and <br /> existing geomembrane on 9850' bench. <br /> ' 1.2 Anchor Trench Backfill <br /> No action during the shift <br />