Laserfiche WebLink
NewFields <br /> Perspective. Vision. Solutions. <br /> ' FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> ' Project:VLF2 Geomembrane Recertification <br /> ' NewFields Project Number: 475.0106.026 <br /> Date: July 2, 2018 <br /> ' S M T W T F S <br /> ' Temperature: Low: 520F to High: 770F Weather: Mostly Sunny <br /> NEWFIELDS PERSONNEL <br /> ' Name Hours <br /> Benjamin Melly 13 <br /> ' Alex Lewallen 12 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> ' 1.1. Drain Cover Fill Placement <br /> A Cat D6T LGP dozer was used to push and placed the Drain Cover Fill (DCF) material between <br /> 9650' bench and 9700' elevation at the minimum of two-foot lift. <br /> 1.1 Drain Cover Removal <br /> ' A Cat D6T LGP dozer was also utilized to remove DCF on 9900' bench to expose the anchor trench. <br /> ' 1.2 Anchor Trench Backf ill <br /> A CAT 305.5 E mini excavator was utilized to backfill the anchor trench with the first layer of Soil <br /> ' Liner Fill (SLF) on the 9850' bench. The hand compactor was used to compact the anchor trench. <br /> ' 1.3 Geomembrane Removal <br /> No activities during the shift. <br /> 1 <br /> www.NewFields.com9400 Station • -Tree,Colorado 801241 0 11 <br />