My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-07-11_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2018-07-11_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2021 5:04:26 AM
Creation date
7/12/2018 9:31:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
7/11/2018
Doc Name Note
Record of Construction Report
Doc Name
Construction Quality Assurance Report (CQA)
From
CC&V
To
DRMS
Type & Sequence
TR100
Email Name
TC1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
m NewFields <br /> ' Perspective.Vision. Solutions. <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek & Victor Gold Mining Company <br /> Project: VLF2 Geomembrane Recertification <br /> NewFields Project Number: 475.0106.026 <br /> Date:June 28, 2018 <br /> ' S M T W T F S <br /> Temperature: Low: 56°F to High: 81°F Weather: Clear <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> ' Benjamin Melly 13 <br /> Alex Lewallen 12 <br /> ' 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1 Drain Cover Fill Placement <br /> ' Mine Operations delivered Drain Cover Fill (DCF) from the stockpile to placement area between <br /> 9650' elevation and loading area. A Cat D6T LGP dozer was used to push and placed the DCF <br /> material between 9650' bench and 9691' elevation at the minimum of two-foot lift. <br /> 1.2 Anchor Trench Excavation <br /> ' A CAT 305.5 E mini excavator was used to excavate approximately 32 feet of anchor trench on <br /> the 9850' bench. <br /> 1.3 Geomembrane Removal <br /> A Cat 312C L excavator was utilized to remove the DCF and geomembrane to expose the Soil Liner <br /> Fill (SLF) on 9750'. <br />
The URL can be used to link to this page
Your browser does not support the video tag.