Laserfiche WebLink
m NewFields <br /> ' Perspective.Vision. Solutions. <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek & Victor Gold Mining Company <br /> Project: VLF2 Geomembrane Recertification <br /> NewFields Project Number: 475.0106.026 <br /> Date:June 28, 2018 <br /> ' S M T W T F S <br /> Temperature: Low: 56°F to High: 81°F Weather: Clear <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> ' Benjamin Melly 13 <br /> Alex Lewallen 12 <br /> ' 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1 Drain Cover Fill Placement <br /> ' Mine Operations delivered Drain Cover Fill (DCF) from the stockpile to placement area between <br /> 9650' elevation and loading area. A Cat D6T LGP dozer was used to push and placed the DCF <br /> material between 9650' bench and 9691' elevation at the minimum of two-foot lift. <br /> 1.2 Anchor Trench Excavation <br /> ' A CAT 305.5 E mini excavator was used to excavate approximately 32 feet of anchor trench on <br /> the 9850' bench. <br /> 1.3 Geomembrane Removal <br /> A Cat 312C L excavator was utilized to remove the DCF and geomembrane to expose the Soil Liner <br /> Fill (SLF) on 9750'. <br />