Laserfiche WebLink
Page 4 <br /> Mr. Mark Johnson <br /> May 30,2018 <br /> Mitigation measures may include, but are not limited to: <br /> Placing water in a recharge pond to raise groundwater levels around the well. <br /> Cleaning the well to improve efficiency. <br /> Providing an alternative source of water or purchasing additional water to support historic well use <br /> in terms of water quantity and quality. If needed, water quality parameters will be checked in <br /> affected wells to ensure alternative sources support historic use. <br /> Modifying a well to operate under lower groundwater conditions. This could include deepening the <br /> well or lowering pumps. All work would be done at the miner's expense with the exception of <br /> replacing equipment that was non-functional prior to mining. <br /> It existing wells cannot be retrofitted or repaired, replacing the impacted well. <br /> Please call if you have any questions. <br /> Sincerely, <br /> CIVIL RESOURCES, LLC <br /> �1 <br /> Gary Linden, P.G. <br /> J:IBestway-21311nouyelgroundwater groundwater-memo)nouye.doc <br />