My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-07-10_HYDROLOGY - C1981038
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1981038
>
2018-07-10_HYDROLOGY - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2018 8:01:47 AM
Creation date
7/10/2018 11:36:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Hydrology
Doc Date
7/10/2018
Doc Name
Quarterly Sediment Pond/Impoundment Report Adequacy Review
From
DRMS
To
Bowie Resources, LLC
Annual Report Year
2018
Report Quarter_Month
2
Permit Index Doc Type
Sediment Pond Inspections
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us <br />John W. Hickenlooper, Governor | Robert W. Randall, Executive Director | Virginia Brannon, Director <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br /> <br /> <br />Mr. Basil Bear <br />Bowie Resources, LLC <br />P.O. Box 1488 <br />Paonia, CO 81428 <br /> <br /> <br />July 10, 2018 <br /> <br />Re: Second Quarter 2018 Sediment Pond Inspection Review <br /> <br />Dear Mr. Bear: <br /> <br />The Division received the second quarter 2018 quarterly sediment pond inspection reports for the <br />Bowie No. 1 Mine (C1981-038) on July 9, 2018. <br /> <br />All four of the ponds were dry at the time of the inspection, and no maintenance concerns were <br />noted. All four ponds were inspected on June 27, 2018. <br /> <br />The cover letter states that the 2018 Impoundment Yearly Inspection Report was included in the <br />July 9, 2018 submittal. Bowie Resources, LLC submitted this report previously, with the April <br />11, 2018 report submittal. <br /> <br />Thank you for your timely submittal of the reports. <br /> <br />Sincerely, <br /> <br /> Janet H. Binns <br />Environmental Protection Specialist III <br />Janet.binns@state.co.us
The URL can be used to link to this page
Your browser does not support the video tag.