Laserfiche WebLink
MATERIAL OUANTITIES <br />Initial Volume: 1,700 <br />Swell factor: 1.165 <br />Loose volume: 1,981 LCY <br />Source of estimated volume: <br />Source of estimated swell factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: <br />Average push gradient: 0% <br />Division of Reclamation, Mining & Safety <br />Cat Handbook <br />60 feet <br />1,872.0 LCY/hr <br />fill or embankment 0.9 <br />Average site altitude: 5,600 feet <br />Material weight: 2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />BULLDOZER WORK <br />Task description: Regrade Construction Material Stockpile <br />Site: McClane Canyon Mine <br />Permit Action: RN8 <br />Permit/Job#: C1980004 <br />PROJECT IDENTIFICATION <br />Task #: 005 <br />State: Colorado <br />Abbreviation: None <br />Date: 7/2/2018 <br />County: Garfield <br />Filename: 005 <br />User: TNL <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU <br />Horsepower: 405 <br />Blade Type: Semi-Universal <br />Attachment: 3-shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: <br />$100.59 <br />NA <br />Operating Cost/Hour: <br />$87.23 <br />100 <br />Ripper own. Cost/Hour: <br />$10.94 <br />NA <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$41.85 <br />NA <br />Total unit Cost/Hour: $240.61 <br />Total Fleet Cost/Hour: $240.61 <br />MATERIAL OUANTITIES <br />Initial Volume: 1,700 <br />Swell factor: 1.165 <br />Loose volume: 1,981 LCY <br />Source of estimated volume: <br />Source of estimated swell factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: <br />Average push gradient: 0% <br />Division of Reclamation, Mining & Safety <br />Cat Handbook <br />60 feet <br />1,872.0 LCY/hr <br />fill or embankment 0.9 <br />Average site altitude: 5,600 feet <br />Material weight: 2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />