Laserfiche WebLink
`"v'T U.S. DEPT. OF THE INTERIOR° <br />OFFICE OF SURFACE MINING yr <br />Mine Site Evaluation <br />tib State Program <br />1. Permittee/Person <br />9. Permit Number <br />C1981019 <br />10. Permit Type <br />PP <br />COLOWYO COAL CO LP <br />2. Address <br />IL Field Visit Date <br />621/201$ <br />14. Permit Status <br />12. Purpose <br />0132 <br />15. Site Status <br />13. SRA Present <br />0 <br />16. FacilityType <br />11100 WEST 116T11 AVE <br />3. City 4. State <br />WESTNIINSTER <br />CO <br />AP I <br />JA <br />5. Zip Code <br />6. Phone Number <br />17. OSM Office 9 <br />18. CCID # <br />19. Land Code <br />8023 7 <br />1(303)254-3338 <br />140 <br />SF <br />7. Operator Name, if Different than Permittee 20. M.S.H.A. ID 0 21. State Abbrev. 22. Count /Burrough <br />COLOWVO COAL CO LP 1 105-02962FMOFFAT <br />8. Mine Name 23. AVS Permittee Entity ID Number 24. State Office <br />COLOWVO 56837 10 <br />25. Hours 26. Signature BAlock,�. 27. Reviewing Official: <br />4.o a. Permit Review 7 <br />5rgnature <br />9.0 b. Site Visit Time Signature <br />11.0 c. Travel Time I Thomas Medlin, IDN562 I F_Howard Strand <br />d. Report Writing inspector's Name- Reviewers Name <br />5.0 <br />Date: 17/9/20118 Date: 17/10/2018 <br />PermItType - Item 10 IP = Interim Program PP = Permanent Program NP = No Permit <br />Purpose Type Codes - Item 12 CCR Citizen Complaint Referral (non -silo visit <br />Oxx. Oversight RFx Reclamation Fees CC Citizen Complaint (initial site visit) <br />Axx..Assistance F)rx Federal Actions CCF .Assistance <br />Joint Inspection - Rom 13 A joint inspecbon is when a state inspector accompanies an OSM inspector at any time during - e review of the mine site <br />Permit Status - Item 14 AS Abandoned All surface and underground coal mining activities have ceased and operator <br />A Active Coal mining activities occurring or permitted but not yet has left the site without completing reclamation as defined in 30 CFR 840,11(8) <br />disturbed ABI Bond Forfeiture Bond forfeiture officially in processor completed and reclamation in <br />IN Inactive (Permanent Program Permit) Phase II completed or progress or not yet commenced <br />Temporary Cessation of Operations (Interim Program Permit)- A82 Partially Reclaimed Forfeiture: Forfeited site where all bonds have been used to reclaim site <br />Coal mining completed and reclamation activities initiated but site not reclaimed to Program standards <br />OR Bond Release Reclamation completed and State Regulatory A83 Reclaimed Forfeiture Forfeited site that has been reclaimed to Program standards, <br />Authority(RA) has released all of the bond (Phase III Release) NA Not Applicable When site is unpermitted <br />Site Status - Item 16 MC Mining Complete No mining activity on site. site NS Non -Site Visit: Status of site not determined <br />No No Disturbance: No coat mining and reclamation regraded and awaiting bond release. Forfeiture Pending The RA Is pursuing actions to <br />operations have been started TC Temporary Cessation The RA has granted FP revoke the permit, collect the performance band(s) <br />EX Coal Exploration. Coal exploration operations have cessation of mining pursuant to 30 CFR and/or reclamation of forfeited site is in progress <br />started and where coal mining operations have not 8161817 13(b) FR Forfeited and Reclaimed Forfeiture reclamation <br />begun P1 Phase I Release- At least Phase I bond release completed <br />AP Active Coal Producing Coal surface m ning granted for entre permitted area For interim FO Abandoned Site Abandoned site that is permitted but <br />activities are occurring permits, partial bond release there is no bond. <br />AN Active Non -Producing Active non -producing facility P2 Phase ll Release At least Phase II bond release WC Wildcat: Coal mining and reclamation operations have <br />such as tipple or preparation plant. for the entire permitted area or are taking place and the activity is not covered by <br />NM No Mining The Permit Status is active, site is not in P3 Phase III Release Reclamation completed and the required permits from the RA. <br />Temporary Cessation no surface coal mining the RA has released ail bond <br />activity. and site not regraded <br />Facility Type Codes -Item 16 D. ,Ancillary (Haulroad. Conveyor. and/or Rails H Exploration Permits K .Government Financed Construction Exemption <br />A Surface E. Refuse and/or Impoundment I Notice of Intent to Explore L. Remining site permitted under 30 CFR 785.25 <br />B Underground F Loading Facility and/or Tipple J Exempt 16 and 213 <br />C Preparation Plant G . Stockpiles <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments are important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from small businesses about Federal agency <br />enforcement actions. The ombudsman win annually evaluate the enlacement adntilea and rate each agencys respons veness to small business II you are a Small business (a business with 500 or <br />fewer employees Inducting those of affiliates) and wish to comment on the enforcement or compliance acIn ties of OSM call 1488 REG -FAIR (1.888.734.3247) <br />Page 1 <br />