My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-07-09_GENERAL DOCUMENTS - C1981019
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2018-07-09_GENERAL DOCUMENTS - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2018 12:42:39 PM
Creation date
7/9/2018 12:41:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
7/9/2018
Doc Name Note
For (RN7)
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Colowyo Coal Company
Permit Index Doc Type
Findings
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Proposed Decision and Findings of Compliance July 2018 <br />Permit Renewal No. 7 P a g e | 12 <br />MR-182 MR-182 incorporated a new raw water pipeline from the main water tank to a water <br />horse location east of the tank. <br /> <br />MR-183 MR-183 incorporated Exhibit 5, Item 9 to the PAP which contains the final cultural <br />resource discovery report for all the sites that were discovered during operations in <br />2017 for the Collom expansion. <br /> <br />MR-184 MR-184 incorporated discussions concerning the expansion of the Axial Basin <br />Substation within the permit boundary. <br /> <br />MR-185 MR-185 incorporated fifteen power poles within or adjacent to the Collom facilities <br />area. <br /> <br />MR-186 MR-186 incorporated an in-pit drilling program within the Collom Pit. <br /> <br />MR-187 MR-187 consolidated all of Colowyo's annual reclamation and hydrology report <br />rule requirements and permit commitments into Section 2.04.13 in Volume 1 of the <br />PAP. <br />3.5 Status of Violations <br /> <br />No Notices of Violations (NOVs) have been issued since approval of Permit Renewal No. 6. <br />3.6 Applicant/Violator System <br /> <br />Applicant/Violator System (AVS) checks were completed on January 24, 2018 and June 28, 2018. <br />Another check will be made after the proposed decision and before issuance of the permit. <br />3.7 Proposed Decision Date <br /> <br />A Decision date of July 9, 2018 on the renewal application is based on this findings document. <br />3.8 Public Notification of Proposed Approval and Issuance of the Revision <br /> <br />Notice of the Proposed Decision will be published once a week for two consecutive weeks in the <br />Craig Daily Press and Rio Blanco Herald Times (Rule 2.07.4(2)(d)). Notification letters of the <br />Decision will be sent to: Colowyo (Rules 2.07.4(2)(c) and 2.08.5(3)(b)); OSM, Western Regional <br />Coordinating Center (Rules 2.07.4(2)(c) and 2.08.5(3)(b)); the Office of Archaeology & Historic <br />Preservation; the surface and mineral owners of record of the affected land (BLM and the State <br />Board of Land Commissioners); and to the Moffat and Rio Blanco County Commissioners (Rule <br />2.08.5(3)(b)). <br /> <br />If no objections are received within 30 days of the first publication (Rule 2.07.4(3)(a)), and with
The URL can be used to link to this page
Your browser does not support the video tag.