Laserfiche WebLink
i NewFields <br /> Perspective. Vision, F>olutions <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> Project: VLF2 Geomembrane Recertification <br /> NewFields Project Number:475.0106.026 <br /> Date: April 19, 2018 <br /> S M T W T F S <br /> Temperature: Low: 29°F to High: 51°F Weather: Clear <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Benjamin Melly 10 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1 Ore Excavation <br /> A CAT D6T LGP dozer was used to remove ore material between the 9650' and 9670' benches, <br /> stockpiling it near the 9650' bench.The D6T worked on a minimum of 2'of geomembrane cover. <br /> The mini excavator was used to excavate test pit locating the geomembrane along the 9645' <br /> elevation. One test pit was excavated and the geomembrane was exposed. <br /> 1.2 Geomembrane Repair <br /> Damaged geomembrane was removed between 9650' and 9670' elevation. <br /> 2.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel observed ore removal, geomembrane exposure, and the excavation of test <br /> pits during the shift. <br /> www.NewFields.com9400 Station • • • a••80124720.508.3300 <br />