Laserfiche WebLink
E i NewFive. Visiields <br /> Solutions <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> Project: VLF2 Geomembrane Recertification <br /> NewFields Project Number: 475.0106.026 <br /> Date: April 17, 2018 <br /> S M T W T F S <br /> Temperature: Low: 36°F to High:48°F Weather: Overcast,Windy <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Benjamin Melly 10 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1 Ore Excavation <br /> A CAT D9T dozer and a CAT D6T LGP dozer were utilized to remove ore material between the <br /> 9650' and 9710' benches stockpiling near 9650' bench. The D6T and D9T worked on a minimum <br /> of 2' and 4' of geomembrane cover, respectively. <br /> The mini excavator was used to excavate test pits to locate the geomembrane along the 9710' <br /> elevation. Five test pits were excavated at an approximate interval of ten feet. The damaged <br /> geomembrane was exposed to the toe of stockpile on the north side. Exposure of damaged <br /> geomembrane will continue on the south side tomorrow. <br /> 1.2 Geomembrane Repair <br /> No activities performed during the shift. <br /> 2.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel observed ore removal,geomembrane exposure, and the excavation of test <br /> pits during the shift. <br />