Laserfiche WebLink
N■NewFields <br /> Perspective.Vision, Solutions <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> Project: VLF2 Geomembrane Recertification <br /> NewFields Project Number: 475.0106.026 <br /> Date: April 16, 2018 <br /> S M T W T F S <br /> Temperature: Low: 34°F to High: 63°F Weather: Overcast <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Benjamin Melly 10 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1 Ore Excavation <br /> The mini excavator was used to excavate test pits to locate the geomembrane along the 9720' <br /> elevation. Seventeen test pits were excavated at an interval of approximately ten-feet. A <br /> damaged area of geomembrane was discovered.The excavation continued with a D6T LGP dozer <br /> and a mini excavator to identify the extent of the geomembrane damage.The damage is currently <br /> found to be approximately 200' wide running along the 9720' elevation and extends into the <br /> existing ore stockpile. Ore removal continued in the area between the 9720' and 9650' benches <br /> pushing downhill and stockpiling the material near the 9650' bench to allow for further <br /> investigation. All equipment worked on at least 2' of geomembrane cover at all times. <br /> 1.2 Geomembrane Repair <br /> No activities performed during the shift. <br />