E mNewF,ields <br /> Perspective.VisSolutions <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> Project: VLF2 Geomembrane Recertification <br /> NewFields Project Number:475.0106.026 <br /> Date: April 13, 2018 <br /> S M T W T F S <br /> Temperature: Low: 290F to High:41OF Weather: Overcast <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Benjamin Melly 10 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1 Ore Excavation <br /> A CAT D9T dozer and a CAT D6T LGP dozer were utilized to remove ore material between the <br /> 9650' and 9750' benches stockpiling near 9650' bench. The D6T and D9T worked on four-feet of <br /> geomembrane cover. <br /> The mini excavator was used to excavate test pits to locate the geomembrane along the 9740' <br /> elevation. Nine test pits were excavated at an approximate interval of 20'. All existing DCF, <br /> geomembrane, and pipe exposed were found to be undisturbed and in as-built condition. <br /> 1.2 Geomembrane Installation <br /> No activities performed during the shift. <br /> 2.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel observed ore removal, geomembrane exposure, and the excavation of test <br /> pits during the shift. <br />